My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV91807
DRMS
>
Back File Migration
>
Revision
>
REV91807
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:13:18 AM
Creation date
11/21/2007 11:14:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977170
IBM Index Class Name
Revision
Doc Date
9/4/1998
Doc Name
RECLAMATION COST SUMMARY FORM
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Sheet 1 of 2 <br />Colorado Division of Minerals and Geology <br />ESTIMATSNG FORM - WEEEL LOADER WORK ' <br />Task q: 3 Prep. by: JD Task filename M170-3 <br />Date 09/09/9B Permit q:M-77-170 Mine: Butala Gravel Pit <br />Permitting action Phased Reclamation <br />Task description Replace Growth Medium in wash Pond Area <br />I <br />HOURLY EQUIPMENT COST <br />_____________________ Hasic machine: CAT 910E (199 Horsepower = EO <br />Attachment ql: ROPS Cab Shift bas is:l/day <br />(OQI @bQ) <br />Cost Breakdown - Ownership = $8.88 <br />""--'""""--'"" Operating-loader = 511.79 100 \ utilization ' <br />- Operator = $23.12 <br />- Total cost/hr = 593.78 Total fleet cost/hr = $43.78 <br />MATERIAL QUANTITIES <br />Initial Swell Prnal <br />volume = 4,302.0 CCY Eactot = 1.125 volume = 4,839.8 LCY <br />Quantity sourcejreference Calculation <br />i Svell source/reference Program <br />HOURLY PRODUCTION <br />Loader Cycle Time <br />Unadjusted Basic Cycle Time (load, dump fi maneuver) = 0. 450 min. <br /> (CHB Qbal <br />Cycle Time Factors: Factor Imin.l <br />Material- Mixed material 0. 020 ICHB oLCi) <br />Pile- Conveyor or dozer piled 10 fc. high 6 0. 000 (CF® oL(S) <br />Truck Ownership- Common ownership of trucks fi loaders -0. 040 ICHB oLII) <br />Operation- Constant operation -0. 090 (CHB oL6) <br />Target- Nominal target <br />______________________________________ 0. 000 (CHH oLBI <br /> Net Lytle Time Adj.= -0. 060 min. <br /> Adj. Basic Cycle Time = 0. 390 min. <br />
The URL can be used to link to this page
Your browser does not support the video tag.