Laserfiche WebLink
• Sheet 1 of 2 <br />Colorado Division of Minerals and Geology <br />ESTIMATSNG FORM - WEEEL LOADER WORK ' <br />Task q: 3 Prep. by: JD Task filename M170-3 <br />Date 09/09/9B Permit q:M-77-170 Mine: Butala Gravel Pit <br />Permitting action Phased Reclamation <br />Task description Replace Growth Medium in wash Pond Area <br />I <br />HOURLY EQUIPMENT COST <br />_____________________ Hasic machine: CAT 910E (199 Horsepower = EO <br />Attachment ql: ROPS Cab Shift bas is:l/day <br />(OQI @bQ) <br />Cost Breakdown - Ownership = $8.88 <br />""--'""""--'"" Operating-loader = 511.79 100 \ utilization ' <br />- Operator = $23.12 <br />- Total cost/hr = 593.78 Total fleet cost/hr = $43.78 <br />MATERIAL QUANTITIES <br />Initial Swell Prnal <br />volume = 4,302.0 CCY Eactot = 1.125 volume = 4,839.8 LCY <br />Quantity sourcejreference Calculation <br />i Svell source/reference Program <br />HOURLY PRODUCTION <br />Loader Cycle Time <br />Unadjusted Basic Cycle Time (load, dump fi maneuver) = 0. 450 min. <br /> (CHB Qbal <br />Cycle Time Factors: Factor Imin.l <br />Material- Mixed material 0. 020 ICHB oLCi) <br />Pile- Conveyor or dozer piled 10 fc. high 6 0. 000 (CF® oL(S) <br />Truck Ownership- Common ownership of trucks fi loaders -0. 040 ICHB oLII) <br />Operation- Constant operation -0. 090 (CHB oL6) <br />Target- Nominal target <br />______________________________________ 0. 000 (CHH oLBI <br /> Net Lytle Time Adj.= -0. 060 min. <br /> Adj. Basic Cycle Time = 0. 390 min. <br />