Laserfiche WebLink
<br />HOURLY PRODDCTION cont'd Sheet 2 of 2 <br />Loader tycle Time con ['d <br />Rolling Resistance <br />__________________ <br />Roadway underf oot ing conditions: <br />Haul :Rutted dirt, little/no ma int., l-2" Lire pen. <br />Return:RUtted dirt, little/no ma in[., 1-2" tize pen. <br /> Grade Rolling Total Travel <br /> Length Resist. Resist. Res is[. Time <br />Haul 6 return Time: (ft) (k) (k) (k~ (min.) <br />Haul Route: 700 -5.00 5.00 0.00 0.994 (CHB 'm°) <br />Return Route: 700 5.00 5.00 <br />_______________________________ 10.00 <br />_______ O.T44 (CfIB = ~I <br /> Total travel time = 1.238 <br /> Total cycle time = 1.628 minutes <br />Loader Bucket Capaci <br />____________________ ty <br />__ <br />Rated Capacity= 1.30 LCY (heaped) <br />Bucket fill factor= 1.100 Other - rock/dirt mixtures (100-12 Oki <br />Adjusted capacity= 1.93 LCY <br />Job Condr [ion Correction Factors <br />S ice altf cude = 7,170 ft. <br />Altitude correction factor = 1.00 (CHB nL~) <br />Job efficiency factor = 0.83 flsh/day) <br />Net Correction = 0.83 multiplier <br />Dnadjus[ed Hourly Unit Production 52.71 LCY/Hr <br />Adjusted Hourly Uni[ Production 93.75 LCY/Hr <br />Adjusted Hourly Fleet Production 93.75 LCY/Hr <br />JOB COST <br />Fleet size = 1 Loader(s) Total job [>me = 110.63 Hours <br />Unit cost = $1 <br />___ .001 /LCY <br />____ Total job cost = $4,843.76 <br />___________ <br />