Laserfiche WebLink
• • Sheet 1 of 2 <br />Colorado Division of Minerals and Geology <br />_______________"_________________________ <br />ESTIMATING FORM - WHEEL LOADER WORK <br />Task q: 9 Prep. by: JD <br />____________ _____""__ <br />Date 09/09/98 Permit q:M-]]-1"70 <br />____________ _________ <br />Permitting action Phased Reclamation <br />__________"_______" <br />Task description Backfill Wash Ponds <br />Task filename M1]0-9 <br />Mine: Butala Gravel Pi[ <br />___________"_____________________ <br />HOURLY EQUIPMENT COST <br />--------------------= Hasic machine: CAT 910E 1199 Horsepower = 80 <br />______"_"___""_____ __________ <br />Attachment ql: ROPS Cab Shift basis:)/day <br />___________________ _______"_" <br />(DpI rob¢1 <br />Cosc Breakdown - ownership = 58.8E <br />"""""""""~"--- Operating-loader = $11.]9 100 t ut il~zation <br />- Operator = 523.12 <br />- Total cost/hr = $43.]8 Total fleet cost/hr = 543.]8 <br />________ ________ <br />MATERIAL QUANTITIES <br />Initial Swell <br />volume = 9,315.0 CCY factor = <br />Quantity source/reference Calculation <br />t Swell source/reference Program <br />Final <br />1.125 volume = 4,8']6.9 LCY <br />_____ ____________ <br />HOURLY PRODUCTION <br />Loader ycle Time <br />_________________ <br />Unadj usred Bas ic Cycle Time Road, dump 6 maneuver) = 0. 450 min. <br /> (CHB ~ba) <br />Cycle Time Factors: Factor Imin. ) <br />Material- Mixed material 0. 020 (CHB oL6) <br />Pile- Conveyor or dozer piled 10 ft. high E 0. 000 ILA aE 61 <br />Truck Ownership- Common ownership of [zucks a loaders -0. 040 (CHB oD61 <br />Operation- Constant operation -0. 040 (CHB aL61 <br />Target- Nominal to rge[ <br />______________________________________ 0. 000 (EHB oLII) <br /> Net Cycle Time Adj. = -0. 060 min. <br /> Adj. Basic ycle Time = 0. 390 min. <br />