Laserfiche WebLink
<br />HOURLY PRODUCTION cont'd BheeC 2 of 2 <br />Loader Cycle Time cont'd <br />Rolling Resistance <br />Roadway underfoo[ing conditions: <br />Haul :Rutted dirt, little/no main[., l-2" Lire pen. <br />Return:RUt red dirt, little/no main[., l-2" the pen. <br /> Grade Rolling Total Travel <br /> Length Resist. Resist. Resist. Time <br />Haul 6 return Time: (ft) 1}) (}) 1}) (min,l <br />Haul Route: 700 -5.00 5.00 0.00 0.994 (CHB °m°) <br />Return Route: 700 5.00 5.00 10.00 0.794 (CNB -°-) <br /> Total travel time = 1.238 <br /> Total cycle Cime 1.fi2B minutes <br />Loader Bucket Capaci ty <br />Rated Capacity= 1.70 LCY (heaped) <br />Bucket Eill factor= 1.100 Other - rock/dirt mixtures (100-12011 <br />Adjusted capacity= 1.43 LCY <br />Job Condition Correction Factors <br />Site altitude = 7,170 E[. <br />Altitude correction factor = 1.00 (CHB a£Q+) <br />Job efficiency factor = 0.83 Ilsh/day) <br />Net Correction = O. B3 multiplier <br />Unadjusted Hourly Unit Production 52. 71 LCY/Hr <br />Adjusted Hourly Unl[ Production 93. 75 LCY/Hr <br />Adjusted Hourly Fleet Production 47` 75 LCY/Hr <br />JOB COST <br />Fleet size = 1 Loader ls) Total job time = 111 .48 Hours <br />Unit cost = $1. 001 /LCY Total job cost $4,880 .91 <br />