Laserfiche WebLink
i <br />HOURLY PRODUCTION cont'd <br />_________________ <br />'i Loader Cycle Time cont'd <br />Sheet 2 of 2 <br />Rolling Resistance <br />Roadway underfoo[ing conditions: <br />Haul :Rutted dirt, little/no maim., l-2" ti re pen. <br />Retuxn:Rutted dirt, <br />_____________ little{no mar nt., l-2" ti re pen. <br />_______________________________ <br />_______ <br /> Grade Rolling Total Travel <br /> Length Resist. Resist. Resist. Time <br />Haul E return Time: (fcl (k) (k) (k) Amin.) <br />Haul Route: 250 2.00 5.00 7.00 0.301 (CHB °m°) <br />Return Route: 250 -2.00 5.00 3.00 0.219 (CHB .°~I <br /> Total [ravel Cime = 0.514 <br /> Total cycle time = 0.904 minutes <br />LoadeY Bucket Capaci <br />____________________ ty <br />__ <br />Rated Capacity= 1.30 LCY (Heaped) <br />Bucket fill factor= 1.100 Other - rock/dirt mixtures (100-120k) <br />Adjusted capacity= 1.43 LCY <br />Job Condition Correction Factors <br />________________________________ <br />Site altitude = 7,170 ft. <br />Altitude corzec non factor = 1.00 ~CHB nD0) <br />Job efficiency factor = O.B3 (lsh/dayl <br />Net Correction = O.fl3 multiplier <br />Unadjusted Hourly Unit Production 94 .86 LCY/Hr <br />Ad]usted Hourly Unit Production ]8 .79 LCY/HY <br />Adjusted Hourly Fleet Production 78. 79 LCY/HY <br />JOB COST <br />Fleet size = 1 Loader(s) Total job time = 59 .55 Hours <br />Unit cost = $0 <br />___ .556 <br />____ /LCY Total job cost = $2,607 <br />_________ .99 <br />__ <br />