Laserfiche WebLink
• Sheet 1 of 2 <br />Co bra tlo Division of Minerals and Geology <br />_________________________________________ <br />ESTIMATING FORM - WHEEL LOADER WORK <br />Task q: 2 Prep. by: JD Task filename M170-2 <br />Date 09/04/98 Permit 1{:M-]]-1]0 Mine: Bu[a la Gravel Pit <br />____________ _________ _________________________________ <br />Permitting action Phased Reclamation <br />_____________________________________________________________ <br />Task des crip[ion Replace Growth Medium in Creosote Area <br />HOURLY EQDIPMENT COST <br />_____________________ Basic machine: CAT 910F (199 Horsepower = SO <br />Attachment kl: ROPS Cab Shift basis:l/day <br />___________________ __________ <br />(DQI Q+bm) <br />Cost Breakdown - Ownership $8.88 <br />"~-"" "'--' Operating-loader = 511.]9 100 k utilization <br />- Operator = 523.12 <br />- Total cost/hr $43.78 Total fleet costJhr = $43.]8 <br />________ ________ <br />MATERIAL QUANTITIES <br />Initial Swell Final <br />volume = 4,168.0 CCY factor = 1.125 volume = 4,689.0 LCY <br />Quantity source/reference Calculation <br />t Swell source/reference Program <br />HOURLY PRODUCTION <br />Loader Cycle Time <br />_________________ <br />Unadjusted Basic Cycle Time (load, dump 6 maneuver) = 0.450 min. <br />ICHB Qba7 <br />Cycle Time Factors: Factor Imin <br />Material- Mixed material 0. 020 IGHB uL6) <br />Pile- Conveyor or dozer piled 10 ft. high S 0. 000 (GHB oL E) <br />Txv ck Ownership- Common ownership of trucks 6 loaders -0. 040 (CHB oL 6) <br />Operation- Constant operation -0. 090 (GHB aLE) <br />Target- Nominal target 0. 000 ICHB oDE) <br /> Net Cycle Time Ad7.= -0. 060 min. <br /> Adj. Basic ycle Time = 0. 390 min. <br />