Laserfiche WebLink
i • i <br />HOURLY PRODUCTION conL'd Sheet 2 of 2 <br />Loader Cycle Time conC'd <br />Rolling Resistance <br />Roadway underfooting conditions: <br />Haul :Rutted dirt, little/no ma int., l-2" tire pen. <br />Return:RVtted dirt, little/no maint., l-2" Lire pen. ' <br /> Grade Rolling Total Travel <br /> Length Resist. Resist. Resist. Time <br />Havl fi return Time: (f tl (k) R) (k) (mi n.l <br />Haul Route: 500 3.00 5.00 8.00 O.SB9 (CHB •Q°) <br />Return Route: 500 -3.00 5.00 <br />_______________________________ 2.00 <br />_______ 0.340 (CHB ~°~) <br /> Total travel time = 0.93'1 <br /> Total cycle time = 1.32"! minutes <br />Loader Bucket Capaci ty <br />Rated Capacity= 1.30 LCY Iheapedl <br />Bucket fill Factor= 1.100 Other - rock/dirt mixtures (100-120k) <br />Adj usced capacity= 1.43 LCY <br />Job Condition Correction Fa cCOrs <br />________________________________ <br />Site altitude = ~. 1'10 Et. <br />Altitude correction factor = 1.00 (CNB nLP) <br />.lob efficiency factor = 0. R3 (lsh/day) <br />Nec Correction = O.B3 multiplier <br />Unadjusted Hourly UniC PtodUCtion 64. 68 LCY/Hr <br />Adjusted Hourly UniC Production 53 .68 LCY/Hr <br />Adjusted Hourly Fleet Production 53. 68 LCY/Hr <br />JOB COST <br />Fleet size = <br />____ 1 <br />___ Loader(s) Total job time = 169. <br />________ 06 <br />___ Hours <br />Unit cost = $0. <br />____ 816 <br />___ /LCY Total job cost ~ $7,901. <br />_________ 88 <br />__ <br />