Laserfiche WebLink
Shee[ 1 of 2 <br />Colorado Division of Minerals and Geology <br />_________________________________________ <br />ESTIMATING FORM - WHEEL LOADER WORK <br />Task #: 1 Prep. by: JD Task filename M170-1 <br />Dace 09/04/90 Permit #:M-77-170 Mine: Buta la Gravel Pit <br />____________ _________ _________________________________ <br />Permitting action Phased Reclamation <br />_____________________________________________________________ <br />Task description Replace Growth Medium in Mined Area <br />_____________________________________________________________ <br />HOURLY EQUIPMENT COST <br />_____________________ Basic machine: CAT 910E <br />Attachment #1: ROPS Cab <br />Cost Breakdown - Ownership = 58.88 <br />'-""'---"" Operating-loader = $11.79 <br />- Operator = $23.12 <br />(199 Horsepower = BO <br />Shifc basis:l/day <br />(DQI 06x4) <br />100 k u[ili zation <br />- Total cos[/hr = $43.78 Total flee[ cost/hr = $93.78 <br />MATERIAL QUANTITIES <br />Initial Swell Final <br />volume = B, 067.0 CCY factor = 1.125 volume = 9,075.9 LCY <br />___________ _________ ____________ <br />Quantity sourcelref erence Calculation <br />_____________________________________________ <br />F Swell source/reference Program <br />HOURLY PRODUCTION <br />Loader Cycle Time <br />_________________ <br />Unadjusted Basic tycle Time (load, dump 6 maneuver) = 0.950 min. <br />(CHB atbo) <br />Cycle Time Factors. Fa ct oY (min <br />Material- Mixed material 0. 020 (CHB aLE) <br />Pile- Conveyor or dozer piled l0 ft. high fi 0. 000 (CHH aL6) <br />Truck Ownership- Common ownership of trucks fi loaders -0. 040 (GHB ai61 <br />Operation- Constant operation -0. 090 (CHB oL6) <br />Target- Nominal forget 0. 000 (GHB oDLi) <br /> Nec Cycle Time Adj.= -0. 060 min. <br /> Adj. Hasic Cycle Time = 0. 390 min. <br />