Laserfiche WebLink
Colorado Divisron of Minerals and Geology sheet 1 of 2 <br />_________________________________________ <br />ESTIMATING FORM - EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />_________________________________________________________ <br />Task p... B Prep. by JD Filename..Ml]0-8 <br />____________ ________ __________ <br />Date..... 09-Sep-98 Permit p M-99-170 Mrne......BUtala Gravel Pit <br />____________ ________ __________________________________________________________________ <br />Permit Action........ Phased Reclamation <br />______________________________________________________________________________________________ <br />Task Description..... Mob/demob Equ ipme n[ <br />______________________________________________________________________________________________ <br />HOURLY EQUIPMENT COST <br />Mob/Demob Eqp. -Tractor <br />-LC. Trailer <br />-Med. Trailer <br />-Hwy. Trarler <br />-Pi loC Car <br />-Hyd. Crane <br />-Fuel Truck <br />-Cube Trvck <br />-Platbed Truck <br />Las[ Update: <br />August, 199] (trucks) <br />NOTE - This is a list to select from, not a list of mandatory items to include. <br />6x4, ]5,000 16 GVN, 7]5 HP, diesel powered <br />25 [on folding gooseneck, drop deck <br />50 ton folding gooseneck, drop deck <br />120 Ton folding gooseneck, drop deck <br />On-highway light duty trvck, 4x2, 130 hp, 1/2 con racing, gasoline powered <br />Grove RTSBE rough terrain hydraulic crane, 20 [on capacity, 125 hp, '!0 ft. boom <br />6x4, 3,600 gallon capacity, 210 HP, diesel powered <br />fix4, 2,500 gallon capacity, 210 HP, diesel powered <br />30,000 lb GVW, 210 HP, diesel powered <br />_______________________________________________________________________________ <br />--------'-----'---"' Lt. Rig Med.Rig Hvy.Rig PiloC Hydraulic Fuel Lube Flatbed <br />Cosc Breakdown: <=25 T. 26-SO T. ~ SO T. Car Crane Truck Truck Truck <br />Ownership Cos[/hr $25.59 $28.30 $31.38 $1 93 $24 12 56 RR 512 66 59 RB <br />Operating Cost/hr = 528.38 $30.1] 532.34 $4.82 $31.48 519.5] $25.56 511.82 <br />Operator Cost/hr = 522.61 $22.61 522.61 $21.82 523.13 522.35 $21.24 $22.35 <br />Helper Cost/hr 521.82 $21.82 521.82 $0.00 $0.00 50.00 50.00 $0.00 <br />Total $98.40 <br />_______ $102.90 <br />_______ 5108.15 <br />_______ $28.3] <br />_______ 5]8.]3 <br />_______ $48.80 <br />_______ 559.96 <br />_______ $42.05 <br />_______ <br />NON-ROADABLE EQUIPMENT : <br />"""""'""""""""" Weight Ownership Haul Rig Fleet Size Haul Trip Return Trip DOT Permit <br />Machine Description (tons) Cos[/hr Cos[/hr (no. hauled) Cos[/hr Cost/hr Cos[/ea <br />Cat 120 Series G 12.]0 $13.16 $98.40 1 $111.56 598.40 <br />CaC 910F 6 Seeding Equ ipment 19.83 $28.88 $98.40 1 $129.28 $98.40 <br />Subtotals $238.89 $196.00 50.00 <br />