Laserfiche WebLink
w <br />ESTIMATING FORM - REVEGETATION WORK cont'd <br />___________________________________ <br />e. SHRUB fi TAEE TRANSPLANTS <br />SPECIES NAME ~ QUAH./ACRE ~ STOCK TYPE 6 SIZE <br />No transplants required <br />C. SEEDBED PREPARATION <br />Tilling method kl: chisel plowing <br />k2: <br />D. SEED APPLICATION <br />Seeding method: drill seeding <br />E. FERTILIZING <br />_______________ FERTILIZER / SOIL AMENDMENT <br />Materials used k1: composced manure - pound •• <br />k2: composced manure - loose cu. f[. <br />k3: <br />Application method kl: tractor drawn manure spreader •• <br />k2: <br />F. MULCHING <br />MULCH / NETTING / OTHER MATERIALS <br />Materials used kl: straw (delivered) - ton <br />k2: <br />k3: <br />p4: <br />Application method kl: power mulcher (hay spr. 1" deep) •• <br />k2: crimping (with tractor) <br />k3: <br />G. JOB COST <br />Total area to be seeded: 29.60 acres. <br />• <br />Filename M170-7 sheet 2 of 2 <br />MATERI AL:~ PLANTING: ~ $/FERT. ~ TOTAL ~ TOTAL <br />$/PLANT ~ $/PLANT PELLET ~ $/PLANT ~ $/ACRE <br />$0.00 <br />Total transplant cost/acre: 50.00 <br />$56.02 <br />__________________ <br />Total cost/acre: $56.02 <br />Total cost/acre: $62.59 <br />UNITS/ACRE ~ UNIT ~ $/UNIT ~ $/ACRE <br />2,000.00 ~ pound ~ $0.07 ~ $146.00 <br />139.00 ~ <br />~ ~ ls.cu.ft ~ $3.84 ~ <br />~ ~ $534.09 <br />Total materials cos[/acre: $680.09 <br />$61.52 <br />____________________________ <br />Total application cost/acre: $61.52 <br />UNITS/ACRE ~ UNIT ~ $/UNIT ~ $/ACRE <br />1.00 ~ ton ~ $78.17 ~ $78.17 <br />~ ~ <br />Total materials cost/acre: $70.17 <br />$62.92 <br />$43.00 <br />____________________________ <br />Total application cost/acre: $105.92 <br />Total $/acre $1,107.71 Total Initial Job Cost= $27,151.24 <br />Estimated failure rate: 20.00} of area. Total $/acres $362.15 Total Reseeding Coste $1,]81.80 <br />• Rea eeding cost items: A C D F GRAND TOTAL JOH COST = $28,933.09 <br />