My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV91488
DRMS
>
Back File Migration
>
Revision
>
REV91488
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:13:01 AM
Creation date
11/21/2007 11:11:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981020
IBM Index Class Name
Revision
Doc Date
10/9/2007
Doc Name
2nd Adequacy Review Letter
From
DRMS
To
J.E. Stover & Associates Inc
Type & Sequence
RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Daie : 03-Oct-2007 Permit or job no.: C-$i-020 Site :Munger Canyon Mine <br />User : __ JRS _ _ Abbreviation : _ _ ~ none _ _ State : Coforado__ __ `_^___ <br />Filename : __C020-OOp _ County : Ga~efd _ _ <br />Agency or organization name :Colorado Division O/ Raclamation, Mining And Safety__ J_ _ __~_ __ _ ___~ <br />Permit or iob action :Permit Renewal O5~ <br />NO. ~ TASK DESCRIPTION <br />_ p0_t j-Putt Road Fitl Maferrat to Base of Cuf Slope _-_ ___ <br />_ 002 '-Regrade Mine Road and Bench with Material from Task 001 <br />-.1-------------'----- <br />_00_3 `-Grade_Munge_r Creek Crossing and Haui_Materia! to Mine _ <br />_ 004 ~ Grade Drainages on Lower Road and Haut Road to Mine <br />tl05 I-Excavate Topsoil and Haul to Mine <br />_0_08 j-Final Grade Alf Disfurtled Areas (<10%) ___ _ ___ _ <br />_010 ~ Seal and Plug Podafs_ _ - _ <br />01 T -Seal Alt_Manitorin_g_Wells _ _ ~ _ _ _ . ` <br />012 ~-Demolish and Remove Att Structures _ _ _ _ _ _ _ _ <br />013 ~-Reseed Mine Areas with_Big Sa_geb_msh_S_h_nrbland_Seed Mix __ <br />014 -Reseed Mine Areas with Big Sagebmsh Shrubfand Seed Mix - <br />_ 016 - Place Mafedal Hauled from Loma Loadout at Base of Mine <br />018 ~-Rip Backfired and Graded Areas of Loma Loadout <br />- I- - ---------- ------ ------ ------ <br />019_ -Final Grade AB Disturbed Areas _ _ _ __ __ - _ __, <br />020 Reseed Loma Loadout ~__- -^ __ _ _ - <br />023 '-Stream Channel Erosion Protection _ ___ ___ _ <br />03T~~-Spread Uncompacfed Refuse ___ __ __ _^____ ~_ __ <br />032.1-COm_pact Uncomp_acte_d Refuse <br />_033 '-PlaCe_C_over_an R_efu_se Pile ~-~--~ ~------_--_ ^~---- <br />034 'Replace Topsoil tram Stockpile to Refuse Pife J ~~ <br />-.._1:----------- ----__-- - ----- - - <br />035 ',-Regrade Haul Road _ <br />__036 _=Reg+'ade _Refu_se Pife Pond_ ____ _ ____ _ ____ <br />037 .-Reseed Refuse Pile, Haul Road and Pond i <br />FORM !FLEET: TASK DIRECT <br />USED SIZE !HOURS COST <br />excavate ; i 89.Sq __$12,3 <br />00 <br />_ <br />dozer 1 <br />- J ° _ <br />163.97 <br />t . <br />$27,Of7 <br />_ <br />_ <br />lrucki j _ <br />fl ~- _. <br />~ <br />5.35 ------ <br />$1.979 <br />tmckt J _ <br />1.11{ ~ $402 <br />truckl ~ J ~ 17.8J1 -$6,515 <br />dozer <br />' 1 <br />t 17.11 <br />- <br />-~- $1,906 <br />-- <br />- <br />-- - <br />' <br />grader - <br />-- <br />i J - <br />l0& - <br />$8 <br />1 <br />_ <br />minesea! ~ _ <br />1 _ <br />69.OQ J _ _ _ <br />_ <br />$4,6>8 <br />borehole j 1 <br />r ,14.OJ0' 4,8 <br />04 <br />$ <br />demolish j _ <br />_ <br />1 - ~ _ T80_00 _ <br />_ <br />_ $29,893 <br />revege I 1 5.84, $9,602 <br />revege I_ J ~ <br />--; <br />- _ <br />14.74, Y _ <br />~~~-$4J,898 <br />-- <br />dozer i <br />1 2 60 $428 <br />ozer ! <br />d 1 3.75 $643 <br />_ <br />grader; _ <br />1 !_ _ <br />3.3ti $255 <br />- <br />revege - <br />~ t i _ _ 5.96, ~ _ <br />$3,206 <br />^ <br />NA 1 66 79 $2Q 952 <br />_ <br />dozer 1 _2.8.6 <br />3 _ <br />__$4,718 <br />_ <br />_ <br />compact ;I _ <br />7 ~_ _ <br />- 4.80, _$614 <br />scraper2 i. -.1_-~.-- 40_65_ _ $13,206 <br />s <br />craper2 j ? 4.98 1,619 <br />$ <br />_ <br />dozer ' _ <br />1 6.37 _ <br />_ <br />~$1, 049 <br />dozer j t <br />~ 3.87 <br />-~ 37 <br />~- <br />$6 <br />reveae I _ <br />1 _ <br />- 9.80 _ _ <br />_ <br />^ $7.087 <br />042 '-Mobdize/Demobilize Equipment for Reclamation I mobilize ~ i j 6. <br />6l1aTOTALS :'~-6$6. <br />• includes inflation factor atljustment of NA % TOTAL DIRECT COST <br />fNDiRECT COSTS <br />OVERHEAD ANO PROFIT - Liability insurance : 2.02 % of direct total = $4,T 15 <br />Performance bond : 1.05 _ <br />% afdirect total = ~ _ __ <br />$2,T4T <br />_ <br />Job superintendent: __ <br />_ <br />ss"28.D0 _ _ <br />brs`...$/hr. $ <br />41.2 <br />5 total= <br />~ _ <br />$13,_530 <br />__ <br />Profit : __ <br />10.00 ~ % of direct _ <br />_ <br />_ <br />total = $20,390 <br />' assume net trmrs = 9G% of fesk hours TOTAL O 8 P = $40,180 <br />LEGAL-ENGINEERING-PROJECT MANAGEMENT- CONTRACT AMOUNT (tlirett~0&P)=' $244,077 <br />Financial warranty processing (legal/related costs) : NA NA <br />~ NA total =_ _ $0 <br />Engineering work and/or coniract/bid preparation : _ 4.25 ___ _ <br />% of enfr. __ NA_ __ total =_- _ _ $10,373 <br />Reclamation management and/or administration: 6.00 %ofcntr. NA total= $t4,645 <br />coenNGENCV- NA' NA total= NA <br />'conungarr:ies accounted ror at task level TOTAL INDIRECT GOST= $65,197 <br />TOTAL BOND AMOUNT (direct+ indirect) _ $269,094 <br />
The URL can be used to link to this page
Your browser does not support the video tag.