My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV91488
DRMS
>
Back File Migration
>
Revision
>
REV91488
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:13:01 AM
Creation date
11/21/2007 11:11:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981020
IBM Index Class Name
Revision
Doc Date
10/9/2007
Doc Name
2nd Adequacy Review Letter
From
DRMS
To
J.E. Stover & Associates Inc
Type & Sequence
RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTEROFFICE <br />MEMORANDUM <br />TO: Dan Mathews <br />FROM: Jim Stark <br />SUBJECT: Munger Canyon Mine RN-OS Cost Estimate <br />DATE: 3 October 2007 <br />Attached are the revised task sheets for the Munger Canyon Mine's Permit Renewa105 <br />reclamation cost estimate. There are six revised sheets (a summary sheet and tasks 012, <br />013, 023, 033 and 034). These new task sheets will replace the corresponding sheets in <br />the estimate you currently have. Based on the changes detailed below, the new liability <br />for the Munger Canyon Mine is $269,094.00. This is an increase in liability of <br />$30,245.00 over the previous estimate calculated for Permit Renewal OS (dated 25 July <br />2007 with a liability of $239,652.00). The Division currently holds a corporate surety in <br />the amount of $230,000.00 so CAM Mining, LLC will need to submit additional bond <br />monies. <br />The first change was to the demolition task sheet (task 012). The length of fencing <br />required following reclamation and seeding was increased from 1,8501inear feet to 8,020 <br />linear feet in Technical Revision 22. The required length of fencing was taken from <br />Figure 2.2-7C and Figure 3.1-5. <br />The second change was to one of the revegetation task sheets (task 013). This task was <br />modified to reflect the nature of the reseeding and mulching at the Munger Canyon Mine <br />following reclamation. Since all equipment access has been blocked to the portal and <br />upper haul road area, the seeding and mulching methods have been changed to hand <br />seeding and mulching. Information was taken from Figure 2.2-4 and current site <br />conditions. <br />The third change was to the stream channel erosion protection task (task 023). This task <br />was modified to reflect the changes incorporated in Technical Revision 22, with the <br />addition of geotextile and riprap to the reconstructed drainages aY the site. The <br />specifications for the drainage channels were taken from Table 3.9-3. <br />
The URL can be used to link to this page
Your browser does not support the video tag.