Laserfiche WebLink
The fourth and final change was to the cover and topsoil replacement tasks at the refuse <br />pile (tasks 033 and 034). These tasks were changed (decreased) to reflect the smaller size <br />of the final refuse pile. <br />In addition to the above changes, the summary sheet and the indirect costs have also <br />changed (increased) because they are a percentage of the direct cost tasks, which, as a <br />whole, increased. Additionally, the hourly cost for the job superintendent has also <br />increased from $39.38/hour to $41.25/hour. <br />Please let me know if you have any questions or need any additional information. <br />cc: Sandy Brown w/out attachments <br />