My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_REVISION - M1980244 (30)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
_REVISION - M1980244 (30)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2021 8:12:00 AM
Creation date
11/21/2007 11:04:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Name
Appendix E
From
Cripple Creek & Victor Gold
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.02 MANUFACTURER QUALITY CONTROL: <br />CONTRACTOR shall enswe that geogrid MANUFACTURER meets [he conditions in this section. <br />• A. Geogrid Tests and Inspection <br />1. Geogrid MANUFACTURER shall perform quality control testing of the geogrid. <br />Samples not satisfying specifications shall result m [he rejection of applicable rolls. At <br />a minimum, the following tests shall be performed for quality control in accordance <br />with test methods specified in Table 2.01. <br />a. Density <br />b. Mass per unit area <br />o. Thickness <br />d. Carbon black content <br />2. At geogrid MANUFACTURER'S discretion and expense, additional testing of <br />individual rolls may be performed to more closely identify noncomplying rolls and to <br />qualify individual rolls. <br />3. Geogrid manufactwer shall perform quality control tests at a frequency of at least every <br />50,000 ft' of geogrid produced. <br />PART 3: EXECUTION <br />3.01 EXAMINATIONS: <br />. A. Conformance Testing <br />1. Geogrid manufacturer shall supply samples of geogrid to CQA ENGINEER for <br />conformance testing. Unless otherwise specified, samples shall be taken at a rate of one <br />per lot, not to exceed one conformance test per 100,000 square feet of geogrid. <br />2. <br />3. <br />3.02 INSTALLATION: <br />For geogrid, the following tests shall be performed using the procedures listed in <br />Exhibit C: <br />a. Mass per unit area <br />b. Aperture size <br />c. Wide strip tensile strength <br />d. Node strength <br />Geogrid shall be rejected if conformance test results do not meet or exceed the values <br />presented in Table 2.01. <br />A. Geogrid Deployment <br />1. No equipment or tools shall damage the geogrid by handling, trafficking, or other <br />means. <br />Section 02776.1 Page 4 of 5 December 9, 1998 <br />Geogrid Golder Associates Revision 3 <br />D:\PFIASEIV PSSA CERl1APPENDIC1E541PPENDIX E TECFEVICAL SPECIFICATIONS\02TlT 61RJ.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.