My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_REVISION - M1980244 (30)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
_REVISION - M1980244 (30)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2021 8:12:00 AM
Creation date
11/21/2007 11:04:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Name
Appendix E
From
Cripple Creek & Victor Gold
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. The storage and handling of the materials is the responsibility of CONTRACTOR <br />from the time the materials aze manufactured until the time the completed installation is <br />accepted. CONTRACTOR is responsible for preparing the storage location and far <br />• the protection of the materials from the elements (e.g. ultraviolet light, moisture, <br />temperature, etc.). <br />3. After CONTRACTOR has removed material from storage, CONTRACTOR shall <br />protect geogrid from puncture, dirt, grease, water, moisture, mud, mechanical abrasion, <br />excessive heat and other sources of damage. <br />4. CONTRACTOR shall preserve integrity and readability of the geogrid roll labels, and <br />store [he rolls such that MANAGER and CERTIFYING ENGINEER have access to <br />the package slips or roll labels for each roll to verify roll acceptance. <br />5. The rolls shall be stored on a prepared surface (not wooden pallets) and should not be <br />stacked more than two rolls high. <br />PART 2: PRODUCTS <br />2.01 MATERIALS: <br />A. Geogrid shall be Tensor UX 1700 HS or equivalent and shall have the following properties: <br />TABLE 2.01 <br />TYPICAL GEOGRID PROPERTIES <br /> <br />PROPERTY ~ TEST METAOD ~ ~ UNITS ~ YALCrE . ' <br />Interla k <br />-o n area COE Methadl % 68 (nom) <br />Reinforcement <br />-creep limited svengths CRI GG3-8T or (ASTM D5262) Ib/ft <br />at 5%strain 2,860 (min) <br />at 10%strain 4,650 (min) <br />-@exural rigidity ASTM DD1388-Crta mg-cm 9,075,000 (min) <br />-tensile strength GRI GGI-87 <br />at 2 %strain 3,000 (min) <br />a[ 5°/o wain 5,700 (min) <br />at ultimate 10,600 (min) <br />-tensile modulus - MD GRI GG-87' Ib/ft 110,000 (min) <br />-junctions GRI GG?-87s <br />strength Ib/ft 9,450 (min) <br />e@icien °/ 90 (min) <br />Material <br />-high density polyethylene ASTM D 1248 % 97 (min) <br /> Type IIUCIass A/ Grade 5 <br />-carbon black ASTM 4218 % 20(min) <br />Notes: <br />1. Pemen[ open area measured without magnification by Corps of Engineers Method as specified m CW 02215 Civil Works Consruction Guide, November <br />1977. <br />2. Lang tens load capacity measlued by through thejunction tensile creep testing to 10,000 hours as described m Gmsynthetic Research Institute test method <br />GG3-87 "Creep Behavior and Long Term Design Load ofGmgrids." <br />3. ASTM D 1388-64 modified to account For wide specimen testing as described in Tensar test method TTM-3.0 "Stiffness ofGeosynthetics" <br />4. Secant modrdus at 2 % elongation measmed by Geosynthetic Research NstiMe test method GGI-87 "Geo®id Tensile Strength" No offset allowances are <br />made m Wculatrng secant rtwdulus. <br />5. Geogridjmctron shmgth andjunction efficiency measured by Creos}nthNic Research Irttitim[e test method GG2-87 "Geogrid Junction Strength." <br />6. The long-term allowable design strength (LTADS) is determined using the method outlined N GRI-GG4 "Detemtination of the Long Term Design Strrngtlt <br />of Stiff Geogrids." The GRI-GG4 method applies carious partial facrors of safety to account far construction damage, junction strenglb, connections, <br />chentical and biological degradation. <br />B. Geogrid shall be capable of retaining its structwe during handling, placement, and long-term <br />service. <br />Section 02776.1 Page 3 of 5 December 9, 1998 <br />Geogrid Golder Associates Revision 3 <br />D'\PHASEI V PSSA CERIIAPPENDICIESWPPEDDIX E TECHNICAL SPECIFICATIONS\02P61Ra.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.