My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_REVISION - M1980244 (30)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
_REVISION - M1980244 (30)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2021 8:12:00 AM
Creation date
11/21/2007 11:04:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Name
Appendix E
From
Cripple Creek & Victor Gold
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.04 PROTECTION: <br />CONTRACTOR shall be responsible for [he following: <br />A. Do not use equipment or tools which damage the geomembrane by handling trafficking, <br />excessive heat, leakage of hydrocarbons, or other means. <br />B. Ensure prepared surface underlying geomembrane has not deteriorated since previous <br />acceptance, and remains acceptable until acceptance by CC&V, as detailed in Section 3.02. <br />C. Keep geotextile elements immediately underlying the geomembrane clean and free of debris. <br />D. Do not permit personnel to smoke or wear damaging shoes while working on geomembrane. <br />E. Unroll panels in a manner which prevents scratches or crimps in geomembrane and does not <br />damage supporting Soil Liner Fill. <br />F. Place panels in a manner that prevents wrinkles (especially differential wrinkles between <br />adjacent panels). <br />G. Prevent wind uplift and damage to geomembrane subgrade by providing temporary and <br />permanent loading and/or anchoring that will not damage geomembrane. <br />H. Minimize direct contact of equipment and personnel with geomembrane. <br />I. Protect geomembrane in areas where excessive traffic is expected with geotextiles, extra <br />geomembrane, or other materials acceptable to MANAGER, DESIGN ENGINEER and <br />CERTIFYING ENGINEER. <br />i 3.05 FIELD PANEL DEPLOYMENT: <br />A. CONTRACTOR shall install field panels at locations indicated on CONTRACTOR'S layout <br />plan, as approved by MANAGER, DESIGN ENGINEER and CERTIFYING ENGINEER. <br />B. CONTRACTOR shall replace damaged (i.e., tom, twisted, or crimped) field panels, or <br />portions [hereof, at no cost to CC&V. CONTRACTOR shall repair less serious damage <br />according to Article 3.10 of [his Section, at no cost to CC&V. CERTIFYING ENGINEER <br />shall determine if material is to be repaired or replaced. <br />C. CONTRACTOR shall remove damaged panels, portions of damaged panels, and other <br />geomembrane scrap. <br />D. CONTRACTOR shall not deploy more geomembrane field panels in one day than can be <br />seamed during the day of deployment. <br />E. Geomembrane deployment shall proceed between ambient temperatures of fourteen degrees <br />(14° F) Fahrenheit to one-hundred degrees (100°) Fahrenheit. Geomembrane placement shall <br />not be done during any precipitation, in the presence of excessive moisture (e.g., fog, rain, <br />dew) or in the presence of excessive winds, as determined by the CQA Monitor. <br />F. Following the installation of the geomembrane, an examination of the entire surface shall be <br />conducted to detect potentially harmful rocks or other objects. Any such objects will be <br />removed and the geomembrane repaired by the CONTRACTOR, at no cost to CC&V. <br />3.06 FACTORY SEAMS: <br />Section 02776 Page 13 of 20 October 25, 2000 <br />Geomembrane Golder Associates Revision 8 <br />D:\PHASEIV PSSA CERTMPENDICIESWPPENDIX ETECHNICAL SPECIFICAT[DNS\993-2099021]61 RB.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.