My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_REVISION - M1980244 (30)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
_REVISION - M1980244 (30)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2021 8:12:00 AM
Creation date
11/21/2007 11:04:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Name
Appendix E
From
Cripple Creek & Victor Gold
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. The Installation Superintendent shall have installed or supervised, at a minimum three <br />installation projects that entailed the installation of at least a total of 1,000,000 square <br />• feet of the type of geomembrane that is being installed at the Cresson Project. <br />4. Actual seaming shall be performed under the direction of a Master Seamer (who may <br />also be the Installation Superintendent) who has seamed a minimum of 1,000,000 <br />square feet of the type of geomembrane that is being installed at the Cresson Project, <br />using the same type of seaming apparatus specified for the Work. <br />5. The Installation Superintendent and/or Master Seamer shall be present whenever <br />seaming is perfonmed. <br />C. Quality Assurance Program <br />1. All WORK shall be constructed, monitored, and tested in compliance with the <br />requrements of the Construction Quality Assurance Plan (Section 01400.2). <br />CONTRACTOR and MANUFACTURER shall participate th and comply with all <br />items in these SPECIFICATIONS and requirements of the CQA plan. <br />2. CONTRACTOR shall ensure that each geomembrane MANUFACTURER that <br />supplies materials to this project has an internal product quality control program that <br />meets SPECIFICATIONS. <br />3. During manufacturing of the geomembtane, samples of geomembrane shall be removed <br />for laboratory testing to ensure compliance with [his SPECIFICATION. Conformance <br />sampling and testing will be performed in accordance with the Construction Quality <br />Assurance Plan. <br />4, CONTRACTOR shall assure that the geomembrane is delivered to the site at least l0 <br />calendar days prior to installation. CONTRACTOR will provide required Quality <br />Control information 10 calendaz days prior to geosynthetics being delivered to the <br />Cresson project and on delivery of geosynthetics to the Cresson project. <br />5. Geomembrane rolls that do not meet the requrements of this SPECIFICATION will be <br />rejected. CONTRACTOR shall replace the rejected material with new material that <br />conforms to the SPECIFICATION requirements, a[ no additional cost to CC&V. <br />6, CONTRACTOR shall ensure that all personnel performing geomembrane seaming <br />operations aze qualified by experience or by successfully passing seaming tests (see <br />Article 3.08(D) of this section). MANAGER reserves the right to reject any welding <br />technician whose performance is unsatisfactory. <br />7. INSTALLER'S Superintendent and QC Inspector shall attend the pre-constmction <br />meeting. <br />D. Field Samples <br />Geomembrane sampling and testing shall be conducted in accordance with the project <br />SPECIFICATIONS for the following: <br />trial seam testing (Article 3.07 of this Section) <br />b. destructive seam testing (Article 3.09 of this Section) <br />• 2. CONTRACTOR shall maintain on-site a minimum of one spare operable tensiometer <br />and provide documentation indicating that all tensiometers used at the project were <br />Section 02776 Page 4 of 20 October 25, 2000 <br />Geomembrane Golder Associates Revision 8 <br />p \PHASEIV PSSA CERTAPPENDICa:S41PPENDIx E TECFEN/CAL SPECffICAnONS',99J-209902))bIRS.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.