Laserfiche WebLink
CONTRACTOR shall uncover, repay any observed damage of the underlying <br />geosynthetics, in accordance with the repair requtrements of Sections 02776.0 and <br />02777.0 of these SPECIFICATIONS, and recover, at no cost to CC&V. <br />7. CONTRACTOR shall place Drain Cover Fill at a rate such that no single area of <br />350,000 square feet of geomembrane liner is exposed to ultraviolet light for more than <br />180 days. <br />8. CONTRACTOR shall provide close continuous monitoring at the point of placement <br />during the placement of the Drain Cover Fill over geosynthetics. <br />9. CONTRACTOR shall verify the fmal thickness of Drain Cover Fill to determine <br />compliance with this SPECIFICATION. CONTRACTOR shall record verification <br />location, elevation, and thickness. CQA Monitor shall witness all verification <br />measurements. CONTRACTOR will submit a method of verifying Drain Cover Fill <br />depth to MANAGER Far approval. Grade markers shall be placed on a 50 foot by 50 <br />foot grid with additional points required for breaks in grade. CONTRACTOR shall <br />remove all grade mazkers under supervision of CQA Monitor after verification <br />measurements have been approved by MANAGER and CERTIFYING ENGINEER <br />and will backfill holes with Drain Cover Fill. Areas with deficient thickness shall be <br />reworked by CONTRACTOR, until acceptable measurements aze obtained. If <br />MANAGER or CERTIFYING ENGINEER suspects the occurrence of any damage <br />to the underlying geosynthe[ics, MANAGER will instruct CONTRACTOR to remove <br />Drain Cover Fill to expose the geosynthetics. CONTRACTOR shall uncover, repair <br />any observed damage of the underlying geosynthetics, in accordance with the repair <br />requirements of Sections 02776.0 and 02777.0 of these SPECIFICATIONS and <br />recover, at no cost to CC&V. <br />• 10. CONTRACTOR will provide adequate illumination as approved by MANAGER, if <br />Drnin Cover Fill placement is carried out at night. A minimum of 2-foot candles <br />measured at the synthetic liner shall be used when Drain Cover Fill placement is carried <br />out at night. <br />Pipe Bedding Material <br />1. Pipe Bedding material shall be placed around the CSP as shown on the drawings. <br />2. For piping external to [he valley leach facility, CONTRACTOR shall compact the Pipe <br />Bedding Material requiring compaction to at least 95 percent of the maximum dry <br />density as determined by the Standard Proctor density test (ASTM D698), and a <br />moisture content 3 percent below and 3 percent over the optimum moisture content. <br />3. CONTRACTOR shall place Pipe Bedding Material in maximum 12-inch loose lifts. <br />Pipe Bedding Material will be worked under pipe haunches by hand ro provide uniform <br />support of the CSP. <br />4. Native material used for backfilling CSP excavation shall be placed in 12 inch to IS <br />inch loose lifts, and compacted by wheel rolling with light, rubber tired or other light <br />compaction equipment, as approved by CERTIFYING ENGINEER. <br />Granular Filter Material <br />1. Granular Filter Material shall be placed beneath the Riprap as shown on the drawings. <br /> <br />Section 02200 Page 15 of 17 March 22, 2000 <br />Earthworks Golder Associates Revision 7 <br />D.\PFLISEIV PSSA CERTWPPENDIC~S\APPENDI%E TECHYICAL SPECIFlCATIONS\@?OORI.DOC <br />