My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_REVISION - M1980244 (30)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
_REVISION - M1980244 (30)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2021 8:12:00 AM
Creation date
11/21/2007 11:04:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Name
Appendix E
From
Cripple Creek & Victor Gold
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J. Bedding Fill <br />. 1. Bedding Filt shall be placed within the limits of the valley leach facility as shown on the <br />DRAWINGS and shall begin only after completion of all, or MANAGER and <br />CERTIFYING ENGINEER approved portion of, excavation and placement of the ore <br />slope regrading and end berm material in the valley leach facility. <br />2. CONTRACTOR shall place and compact the Bedding Fill in loose lifts such that the <br />compacted lift thickness is a minimum of 12-inches. CONTRACTOR shall condition <br />the Bedding Fill to allow a surface that does not cause rutting or other deleterious <br />effects. The moisture content and density shall be uniform throughout the lift. If a lift <br />of compacted Bedding Fill dries out during placement operations, CONTRACTOR <br />shall scarify, moisture condition the dry soil and recompact the lift. If a lift of <br />compacted Bedding Fill becomes overly wet due to precipitation or over watering, <br />CONTRACTOR shall allow the wet soil to dry to [he specified moisture content range <br />before recompaction of fill and placement of geosynthetic materials. <br />CONTRACTOR shall assist CQA Monitor in obtaining soil samples for CQA testing. <br />Bedding Fill sampling shall be scheduled by CQA Monitor with CONTRACTOR to <br />facilitate CQA field testing. <br />4. CONTRACTOR shall trim the surface of the Bedding Fill to the design grades shown <br />on the DRAWINGS. <br />5. CONTRACTOR shall roll the surface of the Bedding Fil l with a smooth drum roller to <br />remove ridges and surface irregularities greater than 0.5 inches in height. <br />CERTIFYING ENGINEER shall determine if surface preparation is sufficient to <br />place geomembrane. On areas with slopes steeper than 3Ha V, CONTRACTOR shat] <br />adopt methods as necessary to obtain the same fmai surface preparations that would be <br />obtained by the passage of a smooth-drum roller on flat or level ground. Pushing of <br />compaction equipment by tracked equipment shall no[ be performed. Wheel ruts on <br />the surface of the Bedding Fill ftom grading equipment shall be repaired by <br />CONTRACTOR prior to placement of the geomembrane by rolling the surface or <br />placing and compacting tailings as approved by CQA Monitor. CONTRACTOR shall <br />take whatever steps necessary to prepare Soil Liner Fill surface to the satisfaction of <br />MANAGER and CERTIFYING ENGINEER, at no additional cost to CC&V. <br />6. CONTRACTOR shall maintain the Bedding Fill surface in a condition suitable for <br />geomembrane installation as specified in these SPECIFICATIONS and in the CQA <br />Plan until the surface is covered. CONTRACTOR shall repay all weather related <br />damage to $edding Fill surfaces or other portions of the Work that have or have not <br />been covered by geomembrane, at no additional cost to CC&V. <br />If any moisture is allowed to collect under the geomembrane prior to or after fmal <br />seaming and softens the Bedding Fill, the geomembrane shall be removed and <br />CONTRACTOR shall recondition and recompact the Soil Liner Fill to meet all <br />placement and trimming SPECIFICATIONS, at no additional cost to CC&V. <br />CONTRACTOR shall remove all hubs and survey stakes in the Bedding Fill and <br />backfill all holes with MANAGER and CERTIFYING ENGINEER approved <br />material. <br />8. CONTRACTOR shall verify [he final thickness of Bedding Fill to determine <br />compliance with this SPECIFICATION. CONTRACTOR shall record as part of the <br />as-built documentation the location, elevation, and thickness of each Bedding Fill <br />verification test. CQA Monitor will witness all verification measurements. Areas with <br />Section 02200 Page 16 of 17 March 22, 2000 <br />Earthworks Golder Associates Revision 7 <br />D NHASEIV PSSA CERIIAPPENDIC~SWPPENDIX E TECHMCnI SPECRlCAT10NSA+_20oft).000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.