My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_REVISION - M1980244 (30)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
_REVISION - M1980244 (30)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2021 8:12:00 AM
Creation date
11/21/2007 11:04:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Name
Appendix E
From
Cripple Creek & Victor Gold
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
will achieve the required density, or bentonite. Areas with deficiencies shall be <br />reworked by CONTRACTOR, until acceptable measurements are obtained at no <br />additional cost to CC&V. <br />18. If tests indicate the Work does not meet the requirements of the SPECIFICATIONS, <br />MANAGER and CERTIFYING ENGINEER will establish the extent of the <br />nonconforming azea. The nonconforming area shall be reworked by CONTRACTOR <br />until acceptable test results are obtained at no additional cost to CC&V <br />19. Prior to any geosynthetics being placed on Soil Liner Fill, the area will be tested by <br />CQA Monitor. No geosyndtetics will be allowed to be placed on frozen material, as <br />defined in Section 3.06, without the azea in question being retested by the CQA <br />Monitor. <br />H. Drain Cover Fill <br />Drain Cover Fill shall be placed over the geomembrane in the locations shown on the <br />DRAWINGS. <br />2. Prior to placing the Drain Cover Fill, CONTRACTOR shall verify by visual inspection <br />that the underlying geosynthetics are free of holes, tears, wrinkles, or foreign objects. <br />MANAGER and CERTIFYING ENGINEER will inspect the geosynthetic for <br />wrinkles prior to placement of Drain Cover Fill. As instructed by MANAGER, <br />CONTRACTOR shall "work out" wrinkles to the satisfaction of MANAGER and <br />CERTIFYING ENGINEER prior to placement of the Drain Cover Fill. In all cases, <br />wrinkles shall not be of a size that they could fold back on themselves. Wrinkles <br />greater than one foot shall be removed and repaired by the INSTALLER. <br />. 3. CONTRACTOR shall place Drain Cover Fill in a single 24-inch loose lift. The <br />tracked equipment shall operate only over previously-placed Drain Cover Fill. <br />CONTRACTOR shall not operate equipment directly on geosynthetics. Only a dozer <br />with a ground pressure not exceeding 8.7 psi can be used to place Drain Cover Fill. A <br />CAT 12G motor grader, or equivalent approved by CERTIFYING ENGINEER, can <br />be used for Drain Cover Fill final grading. Equipment used for placement will not be <br />allowed to pivot on one track (i.e., no abrupt or sharp toms). There shall be no downhill <br />placement on slopes steeper than 4H:1 V. Material can be placed along contours if <br />buttressed from below. Motor graders shall not be allowed to make abrupt toms, brake <br />suddenly, or dig blade in which results in the tires spinning on the Drain Cover Fill <br />surface. <br />4. Highway compatible Rubber tired construction equipment shall not be allowed to travel <br />over the geomembrane or on top of Solution Collection piping unless a thickness of at <br />least 45 inches of Drain Cover Fill has been placed over the geomembrane and on top <br />of Solution Collection piping. The CONTRACTOR will be required to demonstrate to <br />the MANAGER, DESIGN ENGINEER and CERTIFYING ENGINEER that the <br />equipment and procedures used are no[ detrimental to [he geomembrane and piping, at <br />no cost to CC&V. Offroad haul truck traffic shall require a minimum of 60 inches for <br />Cat 773 (or equivalent) of Drain Cover Fill placed over the geomembrane and solution <br />collection piping, and a minimum of 120 inches for CAT 777 (or equivalent) of Dmin <br />Cover Fill placed over [he geomembtane and solution collection piping. <br />5. When placing Drain Cover Fill the maximum acceptable drop height is 3 feet. <br />6. CONTRACTOR shall operate equipment in a manner that is protective of underlying <br />• geosynthetics. [f MANAGER or CERTIFYING ENGINEER suspects [he <br />occurrence of any damage to the underlying geosynthetics, MANAGER will instinct <br />CONTRACTOR to remove Drain Cover Fill to expose the geosynthe[ics. <br />Section 02200 Page 14 of 17 March 22, 2000 <br />Earthworks Golder Associates Revision 7 <br />D ~PHASEN PSSA CERTAPPINO[CR.SWPPENDIX E IECHMCAL SPECIFICATION5~200R~ DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.