My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_REVISION - M1980244 (30)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
_REVISION - M1980244 (30)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2021 8:12:00 AM
Creation date
11/21/2007 11:04:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Name
Appendix E
From
Cripple Creek & Victor Gold
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12. CONTRACTOR shall roll the surface of the Soil Liner Fill with a smooth drum roller <br />to remove ridges and surface irregularities greater than 0.5 inches in height. <br />• CERTIFYING ENGINEER shall determine if surface preparation is sufficient to <br />place geomembrane. On areas with slopes steeper than 3H:1 V, CONTRACTOR shall <br />adopt methods as necessary to obtain the same final surface preparations that would be <br />obtained by the passage of a smooth-drum roller on flat or level ground. Pushing of <br />compaction equipment by tracked equipment shall not be performed. Wheel ruts on <br />the surface of the Soil Liner Fill from grading equipment shall be repaired by <br />CONTRACTOR prior [o placement of the geomembrane by rolling the surface or <br />placing and compacting tailings as approved by CQA Monitor. <br />13. CONTRACTOR will remove angular protmding rocks greater than 3/4 inches in <br />diameter from the compacted Soil Liner Fill surface. Indentations left in the Soil Liner <br />Fill Surface after removal of the rocks shall be filled with either Soil Liner Fill or <br />tailings approved by CQA Monitor, and compacted to achieve final grade. Areas of the <br />Soil Liner Fill surface with concentrated gravelly areas will have tailings approved by <br />CQA Monitor placed on top and compacted to achieve final grade. A maximum <br />thickness of 0.5 inches of tailings will be placed on the Soil Liner Fill, with no more <br />than 60 percent of the Soii Liner Fill surface being covered by tailings. <br />14. MANAGER and CERTIFYING ENGINEER will identify any areas of significant <br />desiccation, crusting or erosion of a lift surface. Soil Liner Fill surfaces found to have <br />desiccation cracks greater than 0.25-inches in width or depth, or which exhibit swelling, <br />heaving or other similar conditions shall be replaced or reworked by CONTRACTOR <br />to remove such defects. Desiccation cracks on the Soil Liner Fill surface less than 0.25- <br />inches in width or depth shall be compacted with a smooth drum roller, <br />CONTRACTOR shall take whatever steps necessary to prepare Soil Liner Fill surface <br />to the satisfaction of MANAGER and CERTIFYING ENGINEER, at no additional <br />cost to CC&V. <br />15. CONTRACTOR shall maintain the Soil Liner Fill surface in a condition suitable for <br />geomembrane installation as specified in these SPECIFICATIONS and in the CQA <br />Plan until the surface is covered. CONTRACTOR shall repair all weather related <br />damage to Soil Liner Fill surfaces or other portions of the Work that have or have not <br />been covered by geomembrane, at no additional cost to CC&V. <br />If any moisture is allowed to collect under the geomembrane prior to or after final <br />seaming and softens the Soil Liner Fiil, the geomembrane shall be removed and <br />CONTRACTOR shall recondition and recompact the Soil Liner Fill to meet all <br />placement and trimming SPECIFICATIONS, at no additional cost to CC&V. <br />16. CONTRACTOR shall remove all hubs and survey stakes m the Soil Liner Fill and <br />backfill all holes with MANAGER and CERTIFYING ENGINEER approved <br />moisture-conditioned Soil Liner Fill or bentonite. Compact with a Proaor hammer or <br />other suitable device that will achieve a kneading type of compaction and will achieve <br />the required density. <br />17. CONTRACTOR shall verify the final thickness of Soil Liner Fill to determine <br />compliance with this SPECIFICATION. Thickness verification shall be performed at a <br />minimum frequency of two measurements per acre using a soil coring device, unless <br />directed otherwise by MANAGER. CONTRACTOR shall record as part of the as- <br />built documentation the location, elevation, and thickness of each Soil Liner Fill <br />verification test. CQA Monitor will witness all verification measurements. <br />• CONTRACTOR shall backfill all holes with MANAGER and CERTIFYING <br />ENGINEER approved moisture-conditioned Soil Liner Fill compacted with a Proctor <br />hammer or other suitable device that will achieve a kneading type of compaction and <br />Section 02200 Page 13 of 17 March 22, 2000 <br />Earthworks Golder Associates Revision 7 <br />D~PHASEIV PSSA CERTAPPENDICa;SWPPENDIX E TECFWICAL SPECIFICAriONS\V12000.1 OOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.