Laserfiche WebLink
SECTION 02200.0 EARTHWORKS <br />• PART t: GENERAL <br />1.01 SUMMARY: <br />This SPECIFICAT[ON describes site preparation, excavation, stockpiling of soils for earthwork if <br />necessary, and placement of Structural Fill, Select Structural Fill, Coarse Shaft Backfill, Underdrain Fill, <br />Low Volume Solution Collection Fill, Bedding Fill, Leak Detection Fill, Soil Liner Fill, Drain Cover Fill, <br />Fine Shaft Backfill, Pipe Bedding Material and Granular Filter Material for the valley leach facility. <br />1.02 RELATED SECTIONS: <br />Refer to the following Sections for related work: <br />Section 01050.0 -Staking and Construction Certification Documentation <br />Section 02776.0 - Geomembrane <br />Section 02777.0 - Geotextile <br />1.03 TOLERANCES: <br />A. Limits ofexcavation, Structural Fill, Select Structural Fill, Coarse Shaft Backfill, Underdmin Fill, <br />Low Volume Solution Collection Fill, Bedding Fill, Leak Detection Fill, Soil Liner Fill, Drain <br />Cover Fill, Fine Shaft Backfill, Pipe Bedding Material and Granular Filter Material for the valley <br />leach facility are defined by the lines and elevations shown on the DRAWINGS. All fill shall be <br />placed to the minimum thicknesses shown on the DRAWINGS. <br />B. Finished grades shown on the DRAWINGS are given in feet, and shall slope uniformly between <br />given spot and contour elevations, without sag or humps. All grades shall provide for namml <br />runoff. <br />C. The Soil Liner Fill and Bedding Fill shall have a minimum thickness of 1.0 foot. <br />D. The Low Volume Solution Collection Fill wilt have a minimum thickness of 3.0 feet at all times, <br />and the Drain Cover fill will have a minimum thickness of 2.0 feet at all times. <br />E. Cleazance of pipes with respect to regulated boundaries will be checked by MANAGER. If <br />clearances are inadequate, CONTRACTOR shall backfill trenches to compaction <br />SPECIFICATIONS and relocate trenches at CONTRACTOR'S expense. <br />F. Correction of overexcavation and backfilling shall be to CONTRACTOR'S account. <br />1.04 QUALITY ASSURANCE: <br />A. All work shall be monitored and tested in compliance with the requirements of the CQA Plan. <br />B. CONTRACTOR shall be aware of all testing activities outlined in the CQA Plan, and shall <br />account for these activities in Ute construction schedule. <br />C. All CQA soils testing (both field and laboratory testing) will be the responsibility of <br />CERTIFYING ENGINEER, as identified in the Earthworks CQA plan. CONTRACTOR <br />shall be responsible for cooperating with CQA Monitor during all testing activities. <br />CONTRACTOR shall provide equipment and labor to assist CQA Monitor in sampling, if <br />requested, and shall also provide access to all areas requiring testing activities. Quality Control <br />• testing shall be the responsibility of the CONTRACTOR <br />Section 02200 Page 1 of 17 March 22, 2000 <br />Earthworks Golder Associates Revision 7 <br />D KPH.\SErv PSSA CERTAPPENDICa:SWPPENOi%E TECFWICAL SPECffICATIONS\02200R'l.DOC <br />