Laserfiche WebLink
I <br />® geomembrane installation observations, such as for deployment, trial seams, defect repair, <br />destruct testing and non-destructive testing; <br />® sampling, testing locations, and test results; <br />® changes to the design DRAWINGS or project SPECIFICATIONS and the justification <br />for these changes; <br />® record DRAWINGS; and <br />®a certification statement that construction was completed in compliance with the <br />DRAWINGS and SPECIFICAT[ONS, signed, and sealed by the CERTIFYING <br />ENGINEER registered in the Stale of Colorado. <br />*** END OF SECTION *** <br /> <br />Section 01400.2 Page 11 of 11 <br />Geosynthetic CQA Plan Golder Associates <br />D^PHASEIV PSSA CEATWPPEhDICIESUPPEM1T)IX ETECHNICAL SPECIFICATIONS\016002R5 DOC <br />March 22, 2000 <br />Revision 5 <br />