Laserfiche WebLink
The Division has no further concems. Revised pages 18, 18a, and 18b were presented in <br />the submittal dated January 23, 2003. <br />Section 2.03.10, Identification of Other Licenses and Permits <br />If applicable, please update the list of other licenses and permits in Section 2.03.10. <br />The Division has no further concems. The operator stated that no permit updates were <br />required. <br />Section 2.05.3, Operation Plan -Permit Area <br />4. Please update BRL's intentions concerning the disposal oftherun-of--mine (ROM) pile <br />material. Does BRL still consider disposal of the ROMmaterial on the east mine portal <br />bench (TR-39) a viable option or can TR-39 be withdrawn? <br />In the submittal dated March 28, 2003, BRL revised page 31 of Section 2.05 to state that <br />BRL will submit a technical revision that will deal with the disposal of the ROM material <br />at the various East Mine benches upon reclamation. In addition, as requested in a letter <br />from BRL dated March 28, 2003, Technical Revision No. 39 was withdrawn. That <br />revision involved the disposal of the ROM material on the portal bench at the East Mine. <br />The Division has three additional questions conceming the March 28, 2003 submittal. <br />a. In the fifth paragraph from the top on revised page 31 of Section 2.05, it is stated that <br />there are 6,000 tons of ROM material left in the stockpile. However, in the next <br />sentence, it is stated that this remaining 17,000 tons of ROM material will be <br />backfilled at the reclaimed East Mine. Please reconcile the difference in amounts. <br />b. Should the amount of ROM stated on revised page 31 and 60b of Section 2.05 be in <br />tons or cubic yards? <br />c. Does the stated amount of ROM that remains include the coaly material that is <br />currently stored on the east end of the warehouse/shop bench? <br />5. Once the Bowie No. I train loadout is transferred to the Bowie No. 2 Mine and it is <br />known that reclamation operations will cease for a period of more than 30 days, BRL <br />needs to notify the Division of the temporary cessation status of the mine. Rule 4.30.1 <br />describes the temporary cessation process. <br />BRL noted the Division's comment. No response was required. <br />Section 2.05.4, Reclamation Plan <br />6. Please revise the reclamation plan in Section 2.05.4 of Volume 1 to add a discussion of <br />