My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-11-22_REVISION - M2003092 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2003092
>
2005-11-22_REVISION - M2003092 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:56:17 PM
Creation date
11/21/2007 10:40:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2003092
IBM Index Class Name
Revision
Doc Date
11/22/2005
Doc Name
Comments and Corrections
From
DMG
To
TMS Consulting
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. Response acceptable. <br />9. Response acceptable, <br />10. Response acceptable. <br />11. Response acceptable. <br />12. Response acceptable. <br />13. Response acceptable, <br />14. Please demonstrate how operations will be managed and what monitoring program will be <br />conducted to ensure groundwater levels do not fluctuate more than two feet at the location of <br />large trees on land adjacent to the proposed permit area. The use of an irrigation pipe off the <br />dewatering pump has been proposed, but has not been demonstrated to be adequate to address <br />this situation and no monitoring of water levels has been proposed. Modeling of the drawdown <br />from pit dewatering may be necessary to demonstrate the affect on the adjacent mature trees. <br />Please indicate measures to be taken during mining if measures taken prove inadequate to <br />maintain the groundwater level at the required elevation in the area of those trees. <br />15. Response acceptable, <br />16. Recirculation of wash plant water is not recommended as it may lead to concentrated levels of <br />selenium in the wash plant discharge ponds. <br />17. Response acceptable. <br />18. Please specify spill containment to be used for all hazardous materials not stored in double wall <br />tanks or with built in double containment; ie: 55 gallon drums, buckets etc. <br />19. Please revise the weed control plan to specify timing for spring and fall management applications, <br />in terms of the growth phase for each of the target weeds (ie: Bud to bloom, rosette, bolting, pre- <br />dormant or prior to first frost). Russian knapweed control will need to be revised to indicate both <br />spring and fall applications. The tamarisk and Russian olive management plan needs to be <br />revised to include spraying the cut stumps within 10 minutes of being cut by the hydro-ax. <br />Treatment of Russian olive during winter months has proven to be less effective in controlling the <br />species. Please specify Russian olive treatment timing during summer and/or fall. <br />Exhibit E -Reclamation Plan <br />20. Response acceptable. <br />21. No response required. <br />22. Response acceptable. <br />23. Response acceptable. <br />24. Response acceptable. <br />25. Response acceptable. <br />
The URL can be used to link to this page
Your browser does not support the video tag.