Laserfiche WebLink
26. Response acceptable. <br />27. Please specify timing for fall application of seed between September 1 and October 15. <br />Exhibit F -Reclamation Plan Mao <br />28. Response acceptable. <br />Exhibit G -Water Information <br />29. Response acceptable. <br />30. Response acceptable. <br />31. Response acceptable. <br />Exhibit I -Soils Information <br />32. No response required. <br />Exhibit J -Vegetation Information <br />33. Response acceptable. <br />Exhibit L -Reclamation Costs <br />34. Please revise the dewatering task to address full dewatering of the pit, or specify how 95 percent <br />compaction will be attained and verified under water. <br />35. Response acceptable. <br />36. Response acceptable. <br />37. The reclamation map shows that the two discharge pipes installed on the Hutchins property have <br />been removed. However, Exhibit L does not include a removal cost for these features. Please <br />correct this discrepancy. <br />38. Please provide dimension and construction specifications for all non-portable structures that will <br />require demolition and disposal. For concrete slabs, please provide all dimensions, indicate if a <br />footer is used and what it's dimensions are, and specify what type of reinforcement is used in the <br />concrete. Please include the concrete spill containment described in the mining plan. <br />Exhibit N -Right of Entrv <br />39. Response acceptable. <br />Exhibit O -Owners of Affected Land <br />40. Response acceptable. <br />