My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-03-13_REVISION - M1997027
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1997027
>
2003-03-13_REVISION - M1997027
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:57:05 PM
Creation date
11/21/2007 10:26:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997027
IBM Index Class Name
Revision
Doc Date
3/13/2003
Doc Name
Inspection and TR Application
From
Earth/Stone Ltd.
To
DMG
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Amendment #1 <br />Exhibit D -Reclamation Plan <br />A. Overburden Replacement; <br />The existing AB horizon soils will be stockpiled on the east side of the pit for reclamation. A 6" <br />to 12" layer will be placed over the entire site upon reclamation and prior to reseeding. <br />Reclamation will occur at the end of the mine life and will not occur in phases concurrently with <br />mining. <br />B. Gradient of Reclaimed Slopes; <br />The pit will have 3H:1 V slopes on the mined faces. The pit floor will be uniform and slope at <br />approximately 2% to the outer edge of the mine site. Berms used to control mining activities will <br />be removed to return the site to a natural look. Cobble rock will be placed in runoff locations to <br />curtail head-cutting due to precipitation. <br />C. Revegetation of the site; <br />Thickness of Plant Growth; No Changes <br />II Seedbed Preparation; No Changes <br />III Plant Types; The following seed recommendations are taken from the Natural <br />Resources Conservation Service recommendations. Based on the natural dry conditions of the <br />site no shrubs have been selected. This decision is in harmony with the existing native conditions. <br />Reclamation Seed Mixture <br />Species ° 'x PLS Drilled Ib/ac <br />Alkali Sacaton 10 0.10 <br />Galleta 45 2.70 <br />Sand Dropseed 5 0.015 <br />Needle-&-Thread 40 3.00 <br />IV Seeding Method; Seeding will be accomplished by drilling if possible, a high rock <br />content in the soils may interfere with drilling the seed. If necessary the seed application rate <br />would be doubled to accommodate broadcast seeding. Seeding will occur during the fall <br />(November) or early spring (March) in order to take advantage of available soil moisture <br />conditions during the spring. The seedbed should be firm and the seed planted to a depth of about <br />0.5 inch. In the event that seed is broadcast it will be incorporated into the soil by light disking or <br />harrow. <br />In order to help create moisture traps, following seeding, a dozer will traverse the slope in <br />an up-and-down manner so that the long axis of the track imprints are pazallel to the slope. <br />V Mulching; No changes <br />VI Sbrubs and Trees; No Changes <br />C <br />
The URL can be used to link to this page
Your browser does not support the video tag.