Laserfiche WebLink
~ Amendment #1 <br />Exhibit C -Mining Plan continued <br />L. Hydrologic Balance /Water Damage; <br />No changes <br />M. Processing of Mined Materials; <br />Crushing, Screening and Asphalt production are anticipated processing activities. All processing <br />equipment will be conducted by portable equipment with separate permitting as required by law. <br />Asphalt Production will require the creation of a temporary earthen or plastic sheeted berm <br />surrounding oil storage vessels capable of containing any immediate spillage. Any spillage will be <br />processed through the Asphalt production equipment prior to the equipment leaving the site. <br />N. Secondary Commodities to be Mined; <br />No Changes <br />O. Incidental Products; <br />No Changes <br />