Laserfiche WebLink
LJ <br />Table D-6 <br /> Area <br />(acres) TS Volume <br />(yd3) OB Volume <br />(yd3) <br />Phase 1 17.64 28,459 256,133 <br />Phase 2 20.60 33,235 299,112 <br />Phase 3 13.82 22,296 200,666 <br />Phase 4 26.16 42,205 379,843 <br />Phase 5 22.26 35,913 323,215 <br />Phase 6 11.80 19,037 171,336 <br />Phase 7 17.96 28,975 260,779 <br />Phase 8 16.30 26,297 236,676 <br />Phase 9 18.47 29,798 268,184 <br />Phase 10 20.54 33,138 298,241 <br />Phase 11 25.48 41,108 369,970 <br />Plant Area 13.46 21,715 N/A <br />Total 224.49 362,177 3,064,156 <br />Note: Overburden will not be stripped from the Plant Area. <br />. Topsoil Berm Stockuiles <br />Topsoil from initial stripping of Phase 1 will be stockpiled in along the western permit boundary <br />near the northwest corner of the permit azea Additional topsoil will stockpiled along the eastern <br />permit boundary west of the Bellew residence. This topsoil stockpile will serve as a visual <br />buffer between the Bellew residence and the mining operation. Table D-7 below provides the <br />dimensions of each topsoil stockpile. <br />Table D-7 <br />To soil Stora a Berms <br />Dimension West Berm East Berm <br />Berm Length (ft) 1,250 500 <br />Berm Height (ft) 8 10 <br />Slope Ratio (H:V) 3:1 2:1 <br />Berm Width (ft) 48 40 <br />Cross section azea ( ) 192 200 <br />Volume (yd) 8,889 3,703 <br />Anderson Pit, Apri107 D-10 <br />