My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-01-20_REVISION - M1977342
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
1998-01-20_REVISION - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2021 11:52:15 AM
Creation date
11/21/2007 10:11:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Revision
Doc Date
1/20/1998
Doc Name
HENDERSON MINE & MILL PN M-77-342 AMENDMENT
From
CLIMAX MOLYBDENUM CO
To
MLRB
Type & Sequence
AM3
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Table 1. Applicable Reclamation Plan Performance Requirements and <br /> Included Implementation Measures (cont.) <br /> Rule Topic Implementation Measure <br /> (2) Woody vegetation Logging of sawtimber will occur for all <br /> management salable materials within the right of way. <br /> Grubbed stumps and slash will be ground <br /> to wood chips for use in other reclamation <br /> at the Henderson Mill, offered as firewood <br /> for employees, or used in the Climax Mine <br /> biosolids program. A portion of the <br /> remaining slash may be burned <br /> (3) Topsoil stockpile See Reclamation Plan and attendant map <br /> configuration (Appendix E). <br /> (4) Rehandling of stockpiled Topsoil stockpiles have been positioned in <br /> topsoil locations that are not expected to be <br /> disturbed until life-of-mine. <br /> (5) Topsoil replacement to Topsoil replacement activities will include <br /> preserve resource considerations for site preparation that <br /> minimizes soil loss. <br /> (6) Substitute topsoil materials Not applicable. Topsoil quantities appear <br /> . sufficient for coverage of disturbance, <br /> Revegetation with similar growth media on <br /> the outslopes of the Henderson railroad <br /> grade indicate material suitability for plant <br /> growth. <br /> (7) Uniform topsoil Growth media will be spread uniformly. <br /> replacement Fertilization will be based on soil tests. <br /> (8) Vegetative pile utilization See 3.1.9 (2) above. <br /> 3.1.10 All Revegetation See Reclamation Plan <br /> 3.1.11 Buildings and structures Plan addresses removal of structures <br /> associated with the overland conveyor <br /> 3.1.12 All Signs and markers The Henderson Mill currently complies <br /> with the signage requirement. <br /> 3A Selected Reclamation Methods <br /> Pursuant to Rule 6.4.5(2) or the Rules, the following discussion provides an <br /> explanation of the type of reclamation chosen for the PC3 Corridor (Rule 6.4.5 <br /> • (2)(c)). <br /> fin.. <br /> 15 <br /> January 16.1998 <br /> Plan d. <br />
The URL can be used to link to this page
Your browser does not support the video tag.