Laserfiche WebLink
! Table 1. Applicable Reclamation Plan Performance <br /> T pp Requirements and <br /> Included Implementation Measures (cont.) <br /> Rule Topic Implementation Measure <br /> (5) Refuse and acid forming Not applicable for acid forming or toxic <br /> material disposal producing materials. Refuse disposal will <br /> be a component of facilities demolition. <br /> Some refuse inert debris may be buried in <br /> place. <br /> 3.1.5 (6) Plugging of drill holes Not applicable. <br /> (7) Maximum slopes Final slope configurations are addressed <br /> in the Reclamation Plan. Slopes will be <br /> graded to as minimum a slope as possible <br /> within affected land boundary. Gradients <br /> more gentle than 3H:1V are targeted. <br /> Approximate original contour will be <br /> sought where cut and fill volumes are <br /> small. Some cut and fill slopes will be <br /> retained at 1HAV in bedrock. 1.5H:1V <br /> slopes may intermittently be stabilized in <br /> unconsolidated bedrock materials. <br /> • Slopes constructed of soil materials will be <br /> no greater than 2HAV in their final <br /> configuration. <br /> (8) Reclamation to agricultural Not applicable. <br /> use <br /> 3.1.6 (1) Water—hydrology and CPDS Permit exists for Henderson Mill - <br /> water quality complies with NPDES point source and <br /> Stormwater requirements. A CWA <br /> Section 404 permit is in place for dredge <br /> and fill activities. <br /> (2) Earthen dams Not applicable. <br /> 3.1.7 All Groundwater— specific Not Applicable to this Amendment. <br /> requirements Addressed in pending Henderson Mine <br /> and Mill Groundwater Monitoring Plan. <br /> 3.1.8 (1) Protection of wildlife See Henderson Overland Surface <br /> Conveyor Environmental Assessment. <br /> (2) Habitat management See Reclamation Plan. Opportunities for <br /> corridor enhancement, view shed control, <br /> habitat diversity, and habitat improvement <br /> have been addressed. <br /> 3.1.9 (1) Topsoil resource protection Topsoil stockpiles will be stabilized for use <br /> in final reclamation. See Reclamation <br /> Plan. <br /> 14 <br /> January 16.1M <br /> PI n.Eoc <br />