Laserfiche WebLink
• Table 1. Applicable Reclamation Plan Performance Requirements and <br /> Included Implementation Measures <br /> Rule Topic Implementation Measure <br /> 3.1.1 (1) Establishing post-mining use Selection for Rangeland and Wildlife <br /> in consultation with land Habitat with allowances for Forest <br /> owners permitted through public notification <br /> process. <br /> (2) Incorporation of Post-Mining See Reclamation Plan. <br /> Use into Reclamation Plan <br /> 3.1.2 Reclaiming substituted land Not Applicable. New affected lands <br /> permitted in this amendment will be <br /> reclaimed. <br /> 3.1.3 Time limit and phased Interim Reclamation to be performed <br /> reclamation within 1 year of completed construction. <br /> Final facility Demolition and removal to be <br /> completed within 5 years of project <br /> completion (life-of-mine). See Timeline, <br /> Appendix D <br /> 3.1.4 Public use Industrial facilities on privately held lands <br /> will be off limits to public use. Industrial <br /> • facilities on Forest Service Lands will <br /> have controlled access as part of the <br /> Forest Service Special Use Permit. Areas <br /> ancillary to the conveyor will embrace <br /> forest service multiple-use objectives. <br /> 3.1.5 (1) Grading See Reclamation Plan. <br /> (2) Backfill to prevent leaching Not Applicable. Materials handled in this <br /> of toxic or acid forming Reclamation Plan are non-sulfide and do <br /> materials not present a risk for ARD. <br /> (3) Grading to control erosion, Erosion control for construction addressed <br /> stabilization of highwalls in Construction Stormwater Management <br /> Plan. Reclamation Plan will have similarly <br /> applied stormwater management plan. <br /> See Reclamation Plan for erosion control <br /> specifics. Highwalls not a component of <br /> disturbance for these affected lands. <br /> Steep cuts will be backfilled or slopes <br /> reduced dependent upon materials <br /> disturbed. <br /> (4) Backfill as soon as feasible Backfill will be completed within one <br /> construction season of the completion of <br /> facilities demolition. <br /> 13 <br /> January 16.1998 <br /> Plan.aoc <br />