My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-01-20_REVISION - M1977342
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
1998-01-20_REVISION - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2021 11:52:15 AM
Creation date
11/21/2007 10:11:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Revision
Doc Date
1/20/1998
Doc Name
HENDERSON MINE & MILL PN M-77-342 AMENDMENT
From
CLIMAX MOLYBDENUM CO
To
MLRB
Type & Sequence
AM3
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Table 1. Applicable Reclamation Plan Performance Requirements and <br /> Included Implementation Measures <br /> Rule Topic Implementation Measure <br /> 3.1.1 (1) Establishing post-mining use Selection for Rangeland and Wildlife <br /> in consultation with land Habitat with allowances for Forest <br /> owners permitted through public notification <br /> process. <br /> (2) Incorporation of Post-Mining See Reclamation Plan. <br /> Use into Reclamation Plan <br /> 3.1.2 Reclaiming substituted land Not Applicable. New affected lands <br /> permitted in this amendment will be <br /> reclaimed. <br /> 3.1.3 Time limit and phased Interim Reclamation to be performed <br /> reclamation within 1 year of completed construction. <br /> Final facility Demolition and removal to be <br /> completed within 5 years of project <br /> completion (life-of-mine). See Timeline, <br /> Appendix D <br /> 3.1.4 Public use Industrial facilities on privately held lands <br /> will be off limits to public use. Industrial <br /> • facilities on Forest Service Lands will <br /> have controlled access as part of the <br /> Forest Service Special Use Permit. Areas <br /> ancillary to the conveyor will embrace <br /> forest service multiple-use objectives. <br /> 3.1.5 (1) Grading See Reclamation Plan. <br /> (2) Backfill to prevent leaching Not Applicable. Materials handled in this <br /> of toxic or acid forming Reclamation Plan are non-sulfide and do <br /> materials not present a risk for ARD. <br /> (3) Grading to control erosion, Erosion control for construction addressed <br /> stabilization of highwalls in Construction Stormwater Management <br /> Plan. Reclamation Plan will have similarly <br /> applied stormwater management plan. <br /> See Reclamation Plan for erosion control <br /> specifics. Highwalls not a component of <br /> disturbance for these affected lands. <br /> Steep cuts will be backfilled or slopes <br /> reduced dependent upon materials <br /> disturbed. <br /> (4) Backfill as soon as feasible Backfill will be completed within one <br /> construction season of the completion of <br /> facilities demolition. <br /> 13 <br /> January 16.1998 <br /> Plan.aoc <br />
The URL can be used to link to this page
Your browser does not support the video tag.