• 2.2.2 Site Preparation, Earthwork, and Construction <br /> Site work for the conveyor system will begin in the spring of 1998 following <br /> receipt of all permits and approvals and as soon as access is possible. Work will <br /> start with the PC2/PC3 conveyor house structure and proceed north along the <br /> PC3 corridor and ROW to the mill. This construction scenario will allow <br /> construction of the transfer station and the avalanche shed to begin early in the <br /> construction season so they can be completed prior to the onset of winter. The <br /> entire PC3 Conveyor ROW development (site clearing and preparation and <br /> earthwork) and associated concrete work also will be completed during the 1998 <br /> season. Installation of equipment in the transfer station will carry into the winter <br /> months of 1998-99. Equipment will be stored offsite and transferred to the site <br /> as required. <br /> The 1998 goal will be to have all components of the transfer station installed, the <br /> • PC3 ROW prepared and developed, and the PC3/SC1 transfer station at the mill <br /> completed to the degree possible without interfering with the operation of the <br /> existing mill conveyor. Installation and precommissionings of the drives for the <br /> PC2 and PC3 conveyors will be completed during the fall of 1998 and the winter <br /> of 1998-99. <br /> All remaining work aboveground will be completed in 1999. This work will <br /> include commissioning of the drives in the transfer station, installation of the PC3 <br /> tables, installation of the conveyor belt, and complete commissioning of the PC3 <br /> Conveyor. Presently, the PC3 Conveyor is scheduled to be running before final <br /> Henderson 2000 shutdown in August 1999. Any site-specific reclamation work <br /> along the conveyor route not completed in 1998 will be completed in 1999; <br /> including, but not limited to topsoil stockpiling, erosion control and stabilization, <br /> and seeding of disturbances such as cut and fill slopes as discussed in the <br /> • Reclamation Plan in Section 3.0. <br /> pEpie <br /> 9 <br /> January 16.1996 <br /> Plam. <br />