r <br /> access the east side of the conveyor. A wide track snow vehicle will be used to <br /> access the conveyor along the 21 % grade. <br /> The conveyor will roughly parallel the existing Colorado Public Service Company <br /> powerline from the point where the conveyor leaves the existing railway ROW. <br /> PC3 will transverse approximately 6200 feet of proposed new affected land from <br /> the point where the 21 % rise begins to the point where it reenters permitted <br /> existing affected land at the southwest corner of the East Branch Reservoir <br /> wetlands. At a point approximately 600 feet beyond where the conveyor re- <br /> enters the existing permit area, PC3 will enter and cross the wetland at the far <br /> south of the East Branch Reservoir. The wetland crossing will be approximately <br /> 800 feet (disturbing 1.54 acres of wetland), beyond which the conveyor will follow <br /> a course adjacent to the eastern side of the reservoir and west of the existing <br /> railway bench to the mill. <br /> • As the conveyor enters the mill area, it will rise onto an elevated structure which <br /> will pass over the existing road into the mill. This raised structure will pass the <br /> conveyor over the Scale House and the corner of the Packing Dock to the <br /> transition house where a new drive and transfer house will be constructed to load <br /> ore from the PC3 Conveyor onto the modified ore storage conveyor (#1). <br /> Construction design for conveyor PC3 will be similar to that for PC2. Standard <br /> modules will be 20 feet in length each holding 4 forward carry idler frames and <br /> two return idler frames. Modules will be mounted on precast concrete ties along <br /> the existing railway ROW until the conveyor leaves the ROW. These concrete <br /> ties will be sized to provide stability for modules to withstand wind loads against <br /> the cover of 85 mph. <br /> �NHe <br /> 8 <br /> January 16,1998 <br /> Plan dm <br />