Laserfiche WebLink
At the vent hole sites, all surface structures will be removed. The holes will be sealed and <br />backfilled for at least 10 feet of length at the top. It will be covered with soil and seeded with the <br />approved seed. Large rocks or dead trees will be placed so that vehicles cannot drive over the <br />sealed hole. <br />The two close-spaced portals will be closed with bulkheads, The top of the existing dump will <br />be seeded. Since the face of the pre-existing waste dump and the cribbed ore bin will not be used <br />or disturbed in this mining effort, they aze not included in the permitted acreage; therefore, they <br />will not be included in this reclamation plan. <br />Al] afore mentioned activities will be completed in a manner that will relieve Cotter from any <br />ongoing stormwater discharge management requirements. <br /> <br />• <br />SM-18 Application for Technical Revision -Page 6 - 7/14/2004 <br />