Laserfiche WebLink
HAUL ROAD -The existing roads and access serving the site are well maintained and ere in good condition <br />Access to the site fs gained from US Highway 6 At the time the operatlon was established. full Intersection <br />improvemonts along the Highway 6 existed and included: acceleration, deceleration, left and tight tum lanes at <br />the sites access point to the staging area A peak of 250 loads per day mey utilize the haul road. Sight <br />distances are adequate, speed limit and other traffic control signs can be found at strategy points In and around <br />the staging area <br />~~ ~ti •, _k <br />~ . , ~ <br />1 ~ ~ r <br />_ ~-' Y~_t <br />~~ - r <br />°~ <br />US Highway 6, east of the intersectfon with _ <br />the site's primary haul road. <br />Concrete produeUon area near northeast comer o/ Phase 1. A storage building Is located In the <br />loreground. <br />