Laserfiche WebLink
PHASE II <br />ITEM DESCRIPTION UNIT QUAN. UNIT <br />PRICE TOTAL <br />1 Mobilization <45 mi. LS $ 2,000.00 <br />2 Grading and Sloping CY 2,500 $ 2.00 5,000.00 <br />3 Place Top Soil CY 17,940 1.50 26,910.00 <br />4 Seed, Mulch, Tack, & Fertilize <br />Pit Floor TYPE "A" AC 14 125.00 1,750.00 <br />5 Seed, Mulch, Tack, & Fertile <br />Side Slo es TYPE "B" AC 2 420.00 840.00 <br /> Subtotal $36,500.00 <br />6 Indirect Costs LS 1,095.00 <br /> Subtotal 37,595.00 <br />7 Project Management LS 2,555.00 <br /> TOTAL PHASE II 40,150.00 <br />PHASE III <br />ITEM DESCRIPTION UNIT QUAN. PRICE TOTAL <br />1 Mobilization <45 mi. LS $ 2,000.00 <br />2 Grading and Sloping CY 19,970 $ 2.00 49,925.00 <br />3 Place Top Soil CY 20,110 1.50 30,165.00 <br />4 Seed, Mulch, Tack, & Fertile <br />Pit Floor TYPE "A" AC 14 125.00 1,750.00 <br />5 Seed, Mulch, Tack, & Fertile <br />Side Slo es TYPE "B" AC 2 420.00 840.00 <br /> Subtotal $84,680.00 <br />6 Indirect Costs LS 2,140.00 <br /> Subtotal 87,220.00 <br />7 Project Management LS 5,930.00 <br /> TOTAL PHASE III 93,150.00 <br />Rev. OSI10/03 <br />