Laserfiche WebLink
Following is an estimate of reclamation costs. Bear in mind that this estimate is based on today's cost and is <br />subject to inflation and economic fluctuations. Changes and revisions as a result of the review process to the <br />accompanying reclamation plan may also affect the total cost. <br />PHASE I & STAGING AREA <br />ITEM DESCRIPTION UNIT QUAN. UNIT <br />PRICE TOTAL <br />1 Mobil¢ation u15 mi. LS $ 6,000,00 <br />2 Grading and Sloping CY 62,830 $ 2.00 125,660.00 <br />3 Place Top Soil CY 39,560 1.50 59,340.00 <br />4 Seed, Mulch, Tack, & Fertile <br />" <br />" AC 31 125.00 875.00 <br />3 <br /> Pit Floor TYPE <br />A , <br />5 Seed, Mulch, Tack, & Fertile <br />" <br />" AC 6 420.00 2 <br />520.00 <br /> Side Sfo es E <br />B , <br />6 Demo.IDispose Conc. Batch LS 10,000.00 <br /> Plant Structure <br />6 Demo./Dispose Conc. Batch CY 200 20.00 000.00 <br />4 <br /> Plant Foundation , <br />7 Demo./Dispose Conc. Batch SY 1,252 10.00 12,500.00 <br /> Plant Flatwork <br />8 o./Dispose Asphalt Plant SY 100 <br />5 5.00 500.00 <br />25 <br /> Pad , , <br />6 Demo./Dispose Steel Building LS 5,000.00 <br />6 Demo./Dispose Steel Builtling CY 90 20.00 1 <br />800.00 <br /> Foundation , <br />6 Demo./Dispose Conc. Washout CY 200 20.00 4,000.00 <br />6 Demo./Dispose Conc. Fuel CY 20 20.00 400 <br />00 <br /> Containment . <br /> Subtotal $260,595.00 <br />9 Indirect Costs LS 10,500.00 <br /> Subtotal 271,095.00 <br />10 Project Management LS 16,750.00 <br /> TOTAL PHASE I $ STAGING $287,845.00 <br />Rev. 08/10/03 <br />