Laserfiche WebLink
PHASE N <br />ITEM DESCRIPTION UNIT QUAN. UNIT <br />PRICE TOTAL <br />1 Mobilization <45 mi. LS $ 2,000.00 <br />2 Grading and Sloping CY 11,300 $ 2.00 22,600.00 <br />3 Place Top Soil CY 27,910 1.50 41,865.00 <br />4 Seed, Mulch, Tack, & Fertilize <br />Pit Floor TYPE "A" AC 16 125.00 2,00.00 <br />5 Seed, Mulch, Tack, 8 Fertilize <br />Side Slo es TYPE "B" AC 1 420.00 420.00 <br /> Subtotal $66,887.00 <br />6 Indirect Costs LS 2,000.00 <br /> Subtotal 68,887.00 <br />7 Project Management LS 4,680.00 <br /> TOTAL PHASE IV 73,567.00 <br />PHASE V <br />ITEM DESCRIPTION UNIT QUAN. UNIT <br />PRICE TOTAL <br />1 Mobilzation <45 mi. LS $ 2,000.00 <br />2 Grading and Sloping CY 10,595 $ 2.00 21,190.00 <br />3 Place Top Soil CY 22,900 1.50 34,350.00 <br />4 Seed, Mulch, Tack, & Fertilize <br />Pit Floor TYPE "A" AC 19 125.00 2,375.00 <br />5 Seed, Mulch, Tack, & Fertile <br />Side Slo es TYPE "B" AC 2 420.00 840.00 <br /> Subtotal $60,755.00 <br />6 Indirect Costs LS 1,825.00 <br /> Subtotal 62,600.00 <br />7 Project Management LS 4,250.00 <br /> TOTAL PHASE V 86,850.00 <br />Rev. 08!10/03 <br />