My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-03-06_REVISION - M2002114
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2002114
>
2007-03-06_REVISION - M2002114
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:56:02 PM
Creation date
11/21/2007 9:14:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002114
IBM Index Class Name
Revision
Doc Date
3/6/2007
Doc Name
Reclamation Liability Estimate
From
DRMS
To
Oldcastle SW Group, Inc. dba United Companies of Mesa County
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 03a <br />Date : 03/06/2007 <br />User : GRM <br />Agency or organization name :DRMS <br />Permit or other job action :Initial Reclamation Liability, AM-01, 2007 <br />Task description :regrade sedimentation pond <br />HOURLY EQUIPMENT COST <br />State :Colorado <br />County :Mesa <br />Site :15 Road <br />Basic machine :Cat D8R Series ll - 8SU (200: Horsepower : 310 <br />Blade type :Semi-Universal <br />Attachment nc. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $58.24 NA <br /> Operating cosUhour : $73.75 100 <br /> Ripper op.cosUhour : $3.43 50 <br /> Operator cosUhour : $32.78 NA <br /> Total unit cost/hour : $168.20 Total fleet cost/hour : $168.20 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 5,700 L CY factor : NA volume : 5,700 LCY <br /> <br />Source of estimated volume :reclamation plan estimate <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 1.10 (Cat Ht3) <br />Unadjusted hourly production : 1,400.0 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shiff/day) <br />Partly consolidated stockpile Spoil pile : 0.80 (fnd-rfJ <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 4,400 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SUfU) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.43 <br />Weight description <br />Decomposed rock - 50% Rock, 50% Earth <br />Adjusted unit production : 607.38 LCY/hr <br />Adjusted fleet production : 607.38 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 9.38 Hours <br />Unit cost : $0.277 /LCY Total job cost : $1,578 <br />PermiUjob# : M-2002-114 <br />Abbreviation :none <br />Filename : M114-03a <br />