My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-03-06_REVISION - M2002114
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2002114
>
2007-03-06_REVISION - M2002114
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:56:02 PM
Creation date
11/21/2007 9:14:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002114
IBM Index Class Name
Revision
Doc Date
3/6/2007
Doc Name
Reclamation Liability Estimate
From
DRMS
To
Oldcastle SW Group, Inc. dba United Companies of Mesa County
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />Task # : 04a <br />Date : 03/06/2007 <br />User: GRM <br />8SU (200; Horsepower : 310 <br />Agency or organization name :DRMS <br />Permit or other job action :Initial Reclamation Liability Estimate, AM-Ol, 2007 <br />Task description :rip areas prior to topsoiling <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Series ll <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Cost Breakdown : Ownership costlhour <br />Dozer operating cosUhour <br />Ripper operating cost/hour <br />OperatorcosUhour <br />Total unit cosUhour <br />MATERIAL QUANTITIES <br />Utilization <br />$58.24 NA <br />$73.75 100 <br />$6.85 100 <br />$32.78 NA <br />Shift basis : 1 per day <br />Data source : (CRG) <br /> <br /> <br /> <br /> <br />$171.63 TotalfleetcosUhour <br />$171.63 <br /> Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA NA Load factor : NA Bank volume : NA BCY <br />Area : 71.40 acres Rip depth (ft) : 1.50 Volume : 172,788 BCY or CCY <br /> <br />Source of estimated quantity :reclamation plans <br />Source of estimated load factor:NA <br /> <br />HOURLY PRODUCTION <br />Alternate methods - Job Condition Correction Factors - <br />Seismic : Seismic velocity : NA feet/second Unadjusted production <br />Unadjusted production : NA cu. yds./hour per selected method : 1,811.16 cu. yds./hour <br /> <br />Area : Avg. ripping depth : 1.50 feeUpass Site altitude : 4,400 feet <br />Average ripping width : 7.08 feeUpass Altitude adjustment : 1.00 (Cat HB) <br />Average ripping length : 150.00 feeUpass Job efficiency factor : 0.83 (1 shiff/day) <br />Average dozer speed : 88.00 feeUminute Net job correction : 0.83 multiplier <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.748 acres/hour Adjusted unit production : 1,503.27 cu. yds./hour <br />Unadjusted production : 1,811.16 cu. yds./hour Adjusted fleet production : 1,503.27 cu. yds./hour <br /> <br />JOB TIME AND COST <br />Fleet size : 1 dozers) Total job time : 114.94 hours <br />Unit cost : $0.114 per cu. yd. Total job cost : $19,727 <br /> <br />State :Colorado <br />County :Mesa <br />Site :15 Road Pit <br />PermiUjob # :M-2002-114 <br />Abbreviation :none <br />Filename : M114-04a <br />
The URL can be used to link to this page
Your browser does not support the video tag.