My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-03-06_REVISION - M2002114
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2002114
>
2007-03-06_REVISION - M2002114
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:56:02 PM
Creation date
11/21/2007 9:14:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002114
IBM Index Class Name
Revision
Doc Date
3/6/2007
Doc Name
Reclamation Liability Estimate
From
DRMS
To
Oldcastle SW Group, Inc. dba United Companies of Mesa County
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 02a <br />Date : 03/06/2007 <br />User <br />02A <br />County:Mesa <br />Site :15 Road Pit <br />PermiUjob# :M--2002-114 <br />Abbreviation :none <br />Filename : M114-02a <br />Agency or organization name :DRMS <br />Permit or other job action :Initial Reclamation Liability Estimate, AM-Ol, 2007 <br />Task description :push overburden to establish 3:1 slope from 2:1 <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Series ll <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank riooer <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUh6ur : $58.24 NA <br />Operating cosUhour : $73.75 100 <br />Ripper op.cosUhour : $1.71 25 <br />Operator cosUhour : $32.78 NA <br />Total unit cost/hour : $166.49 Total fleet cosUhour : $168.49 <br />MATERIAL QUANTITIES - ~ - ~- <br />Initial Swell Loose <br />volume : 40,087 LCY factor : NA volume : 40,087 LCY <br />Source of estimated volume :reclamation plan estimate <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 50 feet <br />Unadjusted howdy production : 1,400.0 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 24.00 % (r <br />Average site altitude : 4,400 feet <br />Material weight : 2,900 Ibs/LCY <br />Weight description <br />Decomposed rock - 50% Rock .50% Fanh <br />8SU (200: Horsepower : 310 <br />Operator skill : 0.75 (au <br />Material consistency : 1.00 (Cat <br />Dozing method : 1.00 (gs <br />Visibility: 1.00 (av <br />Job efficiency : 0.83 (1 shit <br />Spoil pile : 0.80 (fnc <br />Push gradient: 1.50 (Cat <br />Altitude : 1.00 (Cat <br />Material weight : 0.79 (Cat <br />Blade type : 1.00 (S/S <br />Net correction : 0.59 <br />Adjusted unit production : 828.76 LCY/hr <br />Adjusted fleet production : 828.78 LCY/hr <br />__ _.. <br />JOB TIME AND COST ~ -- <br />Fleetsize : 1 Dozers) Total job time : 48.37 Hours <br />Unit cost : $0.201 /LCY Total job cost : $8,053 <br />State :Colorado <br />
The URL can be used to link to this page
Your browser does not support the video tag.