Laserfiche WebLink
6 Reseed, mulch and fertilize all top- <br />soiled areas. Cost is $750/acre x 49.02 <br />acres. 1.0 $36,765 <br />7 Re-grade isolation berm with <br />dozer.(2338 cy @ $.30 per cy) 0.5 $1,234 <br /> Totals 6 $83,321 <br /> D143G Costs (21°i° x direct costs) $17,497 <br /> Total Bond Amount $100,818 <br />Cugnini 12103 37 <br />