My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-01-16_REVISION - M1986061
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986061
>
2004-01-16_REVISION - M1986061
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:56:02 PM
Creation date
11/21/2007 9:11:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986061
IBM Index Class Name
Revision
Doc Date
1/16/2004
Doc Name
Amendment Application
From
Oldcastle SW Group Inc dba Four Corners Materials
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION COSTS <br />EXHIBIT L <br />The worst case reclamation scenario occurs at the end of the mine life. After mining in the final <br />area (South Pit Area 5) is complete, the entirety of the North Pit; and Soutlr Pit Slopes from Areas <br />1, 2 ,3and 4 will already be reclaimed. The northern portion of the Staging Area will be reclaimed <br />earlier in the pit life. The remaining area to be reclaimed at the end of the mine life will be 47.98 <br />acres of flat irrigated pasture and 1.04 acres of dry rangeland slope. The ditches will remair. for <br />the landowners use either to reduce erosion along the slopes or to provide irrigation water. The <br />isolation berm along the dowmhill slope will be removed once satisfactory reclamation growth has <br />occurred. <br />Worst Case ItecIamation Costs and Timetable <br />Task Description Time Needed Cost <br /># months <br />1 Remove Facilities. Allocate cost for 0.5 $3,000 <br /> tank berms, asphalt plant foundation, <br /> and small items. <br />2 Push 30,OOOcy of overburden stock- 1.0 $9,000 <br /> pile onto bench to bring bench eleva- <br /> tion up to match surrounding bench <br /> areas. (30,000 cy @ $0.30 per cy) <br />3 Blend Topsoil and Fines. (39,542 cy 2.0 $l 1,863 <br /> @ $0.30 per cy) <br />4 Disc all topsoiled areas to 1.0' depth. 0.5 $9,596 <br /> Cost is $200/acre x 47.98 acres. This <br /> area is calculated for the flat area to <br /> be reclaimed, not the slopes. <br />5 Spread Topsoil Blend with dozer on 0.5 $11,863 <br /> short push (39542 cy @ $0.30 per cy) <br />Cugtuni 12/03 36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.