Laserfiche WebLink
r <br />ROADAB LE EQUIPMENT: <br />_________ _________ Total Eap <br />Machine Description Cos[/hr <br />Dn 11 Aig 5127. ]4 <br />2500 gal . water truck 537. 03 <br />Flat bed truck 535. 00 <br />MOB/DEMOB SUPPORT EQUIPMENT: <br />___________________________ <br />Non-Roadable Eqp. Description <br />Roadable Eqp. Description <br />Subtotals <br />EQUIPMENT HAUL DISTANCE 6 TIME <br />Nearest major city or town within project area region: Grand Junction <br />______________ <br />Total one way travel distance = 104.0 miles. Average travel speed = <br />Job Time - Non Roadable Equip.= 0.50 hours load Roadable Equip.= <br />2.60 hours haul <br />0.50 hours unload <br />2.60 hours return <br />JOB COST <br /> <br />sheet 2 of 2 <br />Fleet Size Haul Trip Recu rn Trip <br />(no. hauled) Cosc/hr Cost/hr <br />2 5255.48 $255.48 <br />2 $74.06 $74.06 <br />2 $70.00 $70.00 <br /> Subtotals $399.54 <br />_________ 5399.59 <br />_________ <br />weight Ownership Haul Rig Fleet Size Haul Trip Return Trip DOT Permit <br />(cons) Cos C/hr Cost/hr (no. hauled) Cosc/hr Cost/hr Cosc/ea <br /> Subtotals 50.00 $0.00 <br />Total Eqp. Fleet Size Haul Trip Return Trip <br />Cost/hr (no. hauled) Cost/hr Cost/hr <br />Toc al Mob/Demob Cos[ _ $1],057.32 <br />$0.00 $0.00 <br />90.00 mph. <br />N/A hours load <br />2.60 hours haul <br />N/A hours unload <br />2.60 hours return <br />$0.00 <br />NOTE: Non-roadable egmpmenc )haul rig required m cranspoal mob/demob costs based on 2 round trips, each trip <br />consisting of a one-way loaded haul and a one-way empty return. Roadable equipment Ina haul rig required) <br />costs based on one round trip. Colorado DOT requires special permits for oversize equipment on certain <br />specified road segments within the State. Separate permits are required for each rig on each loaded trip. <br />Additionally, pilot cars lone or two per rig depending on degree of oversize) are also required for oversize <br />equipment hauling, and loading/unloading times must be increased substantially for equipment which must be <br />pa rc is lly dismantled for transport and re-assembled ac the job site. Costs for lifting equipment and other <br />support equipment needed for this work should be included in the mob/demob costs. <br />