My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-06-10_REVISION - M1999002
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1999002
>
1999-06-10_REVISION - M1999002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:57:03 PM
Creation date
11/21/2007 9:06:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999002
IBM Index Class Name
Revision
Doc Date
6/10/1999
Doc Name
RECLAMATION COST ESTIMATE
From
DMG
To
STEIGERS CORP
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Colorado Division of Mine tals and Geology <br />_________________________________________ <br />ESTIMATING FORM - STRUCTURAL DEMOLITION WORK <br />sheet 1 of 2 <br />Task No.: 2 Prepared by ACS <br />Pe[mit No.: M-99-002 Filename M002-2 <br />Date 29-May-99 <br />__________________ Operation Yankee Gulch Proj ec[ <br />____________________ <br />____________ <br />Permitting action New application <br />___________________ <br />__________________________ <br />___________ <br />_____________ <br />__________ <br />_______ <br />_____ <br />____________ <br />Task description Remove surface structures <br />MEANS Location Adj us[me nt: 10].20} <br />__________________ of base unit costs - MEANS SITE WORK fi LANDSCAPE COST DATA 199] <br />_______ Edition <br />__ <br /> I I I I MEANS BASEI ADJUSTED <br />STRUCTURE / FACILITY / EQUIPMENT DESCRIPTION DIMENSIONS COMPOSITION QUANTITY UNIT UNIT COST TOTAL COST <br />Remove well field piping Isee notes) see notes steel 1 lumpsuml ••••••• ••• $204,909 <br /> <br />Drspase of well field piping (see notes) I I <br />see notes <br />steel ~ <br />1 I I <br />lumpsuml <br />••••••• ~ <br />••• <br />$]9,362 <br /> <br />Remove fi scrap pipe racks Isee notes) I I <br />see notes <br />I I <br />steel I <br />1 <br />~ I I <br />lumpsuml <br />I I I <br />•••••••••• <br />I <br />55],999 <br />Admin. fi lab bldg. - superstructure SOW x 100E x 16H steel 80,000 cu.ft. 50. 18 $15,43] <br /> <br />Heat Exchanger Bldg. - supe rstruc[ure I I <br />OSW x 140E x 36H <br />steel I <br />378,000 I I <br />cu.ft. <br />$0. I <br />18 <br />$]2,939 <br /> <br />Compressor Bldg. - superstructure I I <br />SSW x 160E x 1BH <br />steel I <br />158,400 I I <br />cu.fc <br />$0. I <br />18 <br />$30,565 <br /> <br />Process Bldg. - superstructure I I <br />75W x 210E x 135H <br />steel I <br />2, 126, 250 I I <br />cu.fc. <br />$0. I <br />18 <br />$410,281 <br /> <br />Pvmphouse Bldg. - supe rscruccu re I I <br />30W x 160E x 18H <br />I I <br />steel ~ <br />86,400 <br />I I I <br />cu.ft. <br />I I <br />$0. ~ <br />18 <br />~ <br />$16,6]2 <br />Fin-fan Cooler SOW x 90L x 18H steel 81,000 cu.Et. 50. 1E 515,630 <br /> <br />Return Water Collection Tank I I <br />BO dia. x 48H <br />steel I <br />241,2]4 ~ ~ <br />cu.Et. <br />I <br />50. I <br />1E <br />$96,556 <br /> <br />Pipeline Feed Surge Tank I I <br />60 dia. x 4EH <br />steel I <br />135,]16 ~ <br />cu.ft. <br />50. I <br />1E <br />526,180 <br /> <br />Eubstation I I <br />I ]OW x ]OL x lOH (es [.1 I <br />steel I I <br />I 99,000 I I <br />cu.ft. I <br />50. I <br />18 I <br />59,955 <br /> <br />Package Generator I I <br />15W x 30L x lOH (est.) <br />steel I I <br />9,500 I <br />cu.fc. <br />50. I <br />18 <br />5868 <br /> <br />Outdoor Switch Gear I I <br />25W x 30L x 15H (esL l <br />steel I I <br />11,250 I <br />cu.£t. <br />$O. I <br />1B <br />$2,1]1 <br /> <br />Test Mine Process Bldg. - supe rsc ructure I I <br />I 97W x 83.5E x 29H I <br />mixed I I <br />I 86,1]2 I I <br />cu.ft. I <br />$0. I <br />18 I <br />516,628 <br /> <br />Test Mine Process Bldg. - slab w/ rods I I <br />97W x 83.5E x 6"T <br />I I <br />concrete I I <br />3,591 <br />I I I <br />sq.ft. <br />I <br />51. I <br />39 <br />I <br />513,09E <br />Admin. Bldg. - slab v/ rods 30W x BOL x 6"T <br />I I concrete 2,900 <br />I I sq.Et. <br />I $3. 39 <br />I SB, 722 <br />Processing Facility - slab w/ rods 80W x 460E x 6"T <br />I I concrete 36,800 <br />I I sq.ft. 53. 39 <br />I 5133,739 <br />Substation - slab w/ rods 200W x 200E x 6"T concrete 90,000 I <br />sq.ft. $3. 39 5195,363 <br />TASK SUBTOTAL - sheet 1 $1,306,966 <br />
The URL can be used to link to this page
Your browser does not support the video tag.