Laserfiche WebLink
<br />Colorado Division of Minerals and Geology sheec 1 of 2 <br />_________________________________________ <br />ESTIMATING FORM - EQUIPMENT MOBILIZATION / DEMOBI LI2ATION <br />Task q... 1 Prep. by ACS Filena me..M002-1 <br />Date..... O1-Sun-99 Permit q M-99-002 Mine...... Ya nkee Gulch Project <br />Pe rmrc Action........ New application <br />_________________________________________ <br />__________ <br />_______________ <br />_________________ <br />___________ <br />Task Description..... Mobilize <br />_________ and demobilize reclamation equipment <br />__________________________________________ <br />_______________ <br />_________________ <br />___________ <br />HOURLY EQUIPMENT COST <br />--------------------- NOTE - This is a list Co select from, not a list of manda tory items to Inc lude. <br />Mob/Demob Eqp. -Tractor 6x4, 75,000 16 GVW, 375 HP, diesel powered <br />-Lt. Trailer 2E ton folding gooseneck, drop deck <br />-Med. Trailer 50 ton folding gooseneck, drop deck <br />-HVy. Trailer 120 Ton folding gooseneck, drop deck <br />-Pilo[ Car On-highway light duty truck, 9x2, 170 hp, 1/2 con rating, gasoline powered <br />-Hyd. Crane Grove RTSBE rough Cerra in hyd rau lrc crane, 20 Con capacity, 125 hp, 70 ft. boom <br />-Fuel Truck 6x4, 3,600 gallon capacity, 210 HP, diesel powered <br />-Cube Truck 6x4, 2,500 gallon capacity, 210 HP, diesel powered <br />-Flatbed Truck: 30,000 lb GVW, 210 HP, diesel powered <br />Last Update: ________________________________ __________ _______________ _________________ ___________ <br />August, 199] Icrucksl <br />Lt. Rig Me d. Rrg Hvy. Rig Pilo[ Hydraulic Fuel Lube Flatbed <br />Cos[ Breakdown: r=2E T. 2fi-60 T. > SO T. Car Crane Truck Truck Truck <br />Ownership Cost/hr = $25.59 $28.30 531.38 $1."13 $24.12 $6.80 $12.66 $7.88 <br />Operating Cost/hr - $28.38 530.1] 532.39 $4.82 $31.48 $19.5'1 525.56 $11.82 <br />Operator Cost/hr = $22.61 $22.61 $22.61 $21.82 $23.13 $22.35 521.24 $22.35 <br />Helper Cost/hr = 721.82 521.82 521.82 $0.00 $0.00 $0.00 $0.00 $0.00 <br />_______ <br />Total = $98.90 <br />_______ _______ _______ _______ <br />$102.]0 $108.15 $28.3] <br />_______ _______ _______ _______ <br />$]8.]l <br />_______ _______ <br />$98.80 <br />_______ _______ <br />$59.96 <br />_______ _______ <br />$42.05 <br />_______ <br />NON-ROADAB LE EQUIPMENT: <br />'--"-' Weight Ownership Haul Rig Fleet S ize Haul Trip ReLUrn Trip DOT Pe rmrL <br />Machrne Description (cons) Cost/hr Cost/hr Ino. hau led) Cost/hr Cos[/hr Cosc/ea <br />D]H dozer 27.50 $76.36 5102.]0 5 $695.70 $517.50 <br />DBN dozer 40.60 $37.39 7102.")0 1 $140.04 $102.70 <br />D6H dozer 19.70 $20.76 590.40 2 $237.52 $196.80 <br />61St scraper 28.20 $24.15 $102.70 1 5126.85 $102.70 <br />Revegetarion equipment 20.00 $50.00 598.40 1 5148.40 $98.40 <br />Subtotals 51,798.11 $1,0[4.10 $0.00 <br />_________ _________ _________ <br />