My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-05-30_REVISION - M1980244 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2003-05-30_REVISION - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:53 PM
Creation date
11/21/2007 8:45:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
5/30/2003
Doc Name
Weekly Const. Report
From
CC & V
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase IVb Weekly Summary No. I7 Pale 3 003-2203 <br />Geomembrane panels M-637 through M-654 were deployed, seamed, and pressure tested by Poly-Flex. <br />Destructive fusion seam samples DF-172 through DF-174 and extrusion seam samples DX 33 were <br />marked and removed. Destructive fusion and extrusion seam peel and shear tests of these samples were <br />not performed during this reporting period. <br />A map of the azea worked is provided in Attachment C. <br />Phase Nc <br />Ames continued limited cut and placed the material in temporary stockpiles within the limits of the <br />Phase Nc area. <br />Field Monitoring and Tesfin¢ Activities <br />Golder observed construction activities associated with Phase IV earthworks. All construction <br />materials and soil materials placed were verified as suitable, and construction methods were in <br />accordance with project specifications. Removal of oversized or deleterious material from all fill <br />areas was observed. Golder observed SF placement in Phase N for materials, lift thickness, <br />moisture content, and compactive effort. <br />Golder observed re-compaction of LVSCF in the Phase Nb PSSA sump after rainfall flooded the <br />azea. The HVSCS riser foundations were compacted and re-graded. Golder CQA monitors <br />performed four nuclear moisture-density tests (LVSCNb-Ola through LVSCNb-04a) on LVSCF re- <br />compacted within the Phase Nb PSSA sump. The tests performed met the requirements of the <br />specifications and the nuclear moisture-density results summary is presented in Attachment B. <br />Golder visually observed the placement and grading of LVSCF in the Phase Nb PSSA area. Golder <br />CQA monitors (one monitor per dozer when dozers are greater than 50 ft apart) observed LVSCF <br />placement and verified minimum thickness of 3 feet. <br />Golder visually observed the placement of DCF in the Phase Nb PSSA area. Golder CQA monitors <br />(one monitor per dozer when dozers are greater than ~0 ft apart) observed DCF placement and <br />verified minimum thickness of 2 feet. <br />Golder observed anchor trench excavation in the Phase IVb PSSA and OSA for proper location and <br />dimension (2' wide by 3' deep). Anchor trench excavation met or exceeded the requirements of the <br />specifications. Golder observed anchor trench backfill in the Phase Nb PSSA for lift thickness and <br />compaction. <br />Golder observed construction of the Primary Underdrain in Phase Nb for trench dimension (5' wide <br />by 3' deep), slope (minimum 1%), materials, and geotextile overlap. Primary Underdrain <br />construction met or exceeded the requirements of the specifications. <br />Golder observed and monitored placement of Bedding Fill (BF) in the Phase Nb PSSA for proper <br />location and thickness (1' deep). Golder monitored compactive effort and fmish grading to verify <br />conditions met specification. <br />r,~enro,~Mar,~-May, ~, zoo3.aa Golder Associates Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.