My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-05-30_REVISION - M1980244 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2003-05-30_REVISION - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:53 PM
Creation date
11/21/2007 8:45:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
5/30/2003
Doc Name
Weekly Const. Report
From
CC & V
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase IVb ~Veekiy Summary No. 17 Page 4 003-2203 <br />Golder observed geomembrane deployment; documenting ambient air temperature, panel <br />dimensions, thickness, seaming, tie-in overlap, and seam testing (trial seams, pressure, vacuum, and <br />destructive). Geomembrane placed in the Phase IVb area met the project specifications. <br />Golder monitored and observed the removal of DCF in the Phase I / IVa /IVb tie-in area. Golder <br />CQA monitors verified width of lap exposure of geomembrane required and marked the existing <br />liner damage for future fie-in activities and repairs. <br />Laboratory Tests <br />Golder obtained QA samples of Drain Cover Fill (DCFb-03) and Bedding Fill (BFb-03) and <br />performed index tests to verify suitability of materials used. The laboratory tests performed met the <br />requirements of the specifications and are presented in Attachment B. <br />Meetin>?s <br />CC&V held a Weekly Contractors meeting on May 13. Items discussed included Safety, <br />Environmental, Schedule, and CQA. The next weekly meeting will be held on May 20, 2003 at <br />10:00 AM. <br />Golder Personnel On-Site <br />A summary of all Golder CQA personnel on site during this reporting period is presented in <br />Attachment A. <br />Sincerely, <br />~~~ r-~ <br />~~i <br />Ron DiDonato <br />Resident CQA Engineer <br />Plisse lV6 l4 Mayil-Maytl, 2003.doc Golder Associdce51nC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.