My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-05-30_REVISION - M1980244 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2003-05-30_REVISION - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:53 PM
Creation date
11/21/2007 8:45:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
5/30/2003
Doc Name
Weekly Const. Report
From
CC & V
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase IVb Weekly Summary No. 1? Pase 2 003-2203 <br />Ames hauled, placed, and compacted Bedding Fill (BF) material onto the east ore inboard slope in the <br />Phase IVb PSSA area. <br />Ames continued Drain Cover Fill (DCF) removal near the Phase I / IVa l IVb tie-in azeas. <br />Ames continued production of DCF at the screen plant located neaz the secondary crusher. <br />Ames hauled and placed DCF onto the Phase Nb PSSA upper geomembrane, in areas above the High <br />Volume Solution Collection System (HVSCS) piping and in areas of the haul road construction, west <br />and north within the PSSA. <br />Ames fusion welded and placed the HVSCS 26-inch piping on the west Phase IVb PSSA upper <br />geomembrane floor. Ames also placed HVSCS piping within the PSSA followed by DCF placement <br />per project plans. <br />Ames constructed approximately 100 feet of Primary Underdrain on the south slope of Substation Hill <br />in the Phase Nb area. <br />Ames placed and graded Low Volume So]ution Collection Fill (LVSCF) on the Phase Nb PSSA lower <br />geomembrane prior to upper geomembrane deployment. During placement to the south of the Phase <br />TVb PSSA sump, approximately 350 feet of Low Volume Solution Collection System (LVSCS) 4-inch <br />piping was not placed on the floor of the PSSA. Ames addressed the concern by notifying CC&V <br />Projects Department, and issued RFI #103. Golder reviewed the design of the area in which the pipe <br />was to be located and detemuned that the LVSCS would meet project specification without the 4-inch <br />pipe. This will be addressed further in a subsequent Golder letter. Ames re-compacted areas of the <br />LVSCF in the PSSA sump riser foundations and de-watered where material was flooded by rainfall. <br />Poly-Flex continued deployment of 100-mil double-sided smooth (upper) LLDPE geomembrane in the <br />Phase IVb PSSA. Poly-Flex deployed 100-mil smooth LLDPE geomembrane over an azea of <br />approximately 200,378 square feet in the Phase Nb PSSA during this reporting period. Geomembrane <br />panels U-272 through U-333 was deployed, seamed, and pressure tested by Poly-Flex. Destructive <br />fusion seam samples DFu-82 through DFu-103 were marked and removed. Destructive fusion and <br />extrusion seam peel and shear tests of samples DFu-80 through DFu-103 were performed and passed <br />per project specifications. <br />Poly-Flex began deployment of 100-mil double-sided textured (upper) LLDPE geomembrane in the <br />Phase IVb PSSA. Poly-Flex deployed 100-mil double-sided textured LLDPE geomembrane over an <br />area of approximately 47,506 square feet in the Plrase iVb PSSA during this reporting period. <br />Geomembrane panels U-334 through U-354 were deployed, seamed, and pressure tested by Poly-Flex. <br />Destructive fusion seam samples DFu-104 through DFu-107 were marked and removed. Destructive <br />fusion and extrusion seam peel and sheaz tests of these samples were not performed during this <br />reporting period. <br />Poly-Flex resumed and completed deployment of 100-mil double-sided smooth (lower) LLDPE <br />geomembrane in the Phase Nb PSSA. Poly-flex deployed 100-mil smooth LLDPE geomembrane over <br />an azea of approximately 27,509 square feet in the Phase IVb PSSA during this reporting period. <br />PFaselW i]Mayll-Mayt7, 2003 doc Golder Associates lnc. <br />